21-61-51-991-003-B Fig. 402A
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C ALL
 21-61-51-991-004 Fig. 403
 __________
3. Job Set-up
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 (Ref. Fig. 402/TASK 21-61-51-991-003-A)
 **ON A/C 301-399,
 (Ref. Fig. 402A/TASK 21-61-51-991-003-B)
 **ON A/C ALL
 Subtask 21-61-51-861-052
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). Subtask 21-61-51-865-053
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 8HH
R **ON A/C 401-499,
 49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC 52HH D08 R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 1HH X22 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 3HH X21
 Air Inlet - Access Panel Location Figure 402/TASK 21-61-51-991-003-A 
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-61-51Page 414 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1
 Air Inlet - Access Panel Location 
 Figure 402A/TASK 21-61-51-991-003-B  
R 1EFF :  301-399,  1  21-61-51 Page 415  
1  1  Feb 01/05 
 1  1 
 1CES  1
 -------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
R  
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302,  
R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC  4HH  Y19  
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,  
R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC  2HH  Y18  
R  **ON A/C 106-149, 303-399,  
R  122VU  4HH  Y19  
R  **ON A/C 401-499,  
R R  122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC  49HH 51HH 50HH  X22 X21Y18 
 **ON A/C ALL 
 FOR 28HH  
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  21HH 23HH 24HH 22HH  W22W21Y21Y20  
R  **ON A/C 401-499, 
R  122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC  53HH 55HH 56HH 54HH  W22W21 Y21Y20
 **ON A/C ALL
 Subtask 21-61-51-941-053
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
C. Safety Precautions
 (1)
 On the panel 30VU:
 (a)
 Make sure that the APU BLEED and the ENG BLEED/1(2) pushbutton switches are released.
 (b)
 Put a warning notice in position to tell persons not to operate these pushbutton switches.
 (2)
 On the HP ground connector put a warning notice in position to tell persons not to supply the ground air.
 Subtask 21-61-51-010-051-A
 D. Get Access
 (1) Remove the access panels (Ref. TASK 53-35-13-000-002).
 (a)
 For the Left air inlet,
-191BB and 191KB.
 (b)
 For the Right air inlet,
 -192FB and 192KB.
 1EFF : ALL 1 21-61-51Page 417 1 1 Aug 01/05R 1 1 1CES 1
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
4. Procedure
_________
 (Ref. Fig. 403/TASK 21-61-51-991-004) Subtask 21-61-51-020-051
 A. Removal of the Air Inlet
 (1) For the Left air inlet,
 (a)
 Remove the clamp (4) and disconnect the bellows (5).
 (b)
 Remove the quick-release pins (9) and (22) and the cross beam (7).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(55)