(2)
Make sure that the access panel/s is/are removed (Ref. TASK 53-35-13-000-002).
(a)
FOR 13HH
-191BB.
(b)
FOR 34HH
-192FB.
1EFF : ALL 1 21-61-15Page 407 1 1 Aug 01/05R 1 1 1CES 1
Subtask 21-61-15-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 13HH
R **ON A/C 401-499,
R 49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 52HH D08
R 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 1HH 3HH X22X21
R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302,
R R 122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 4HH Y19
R R 122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC **ON A/C 106-149, 303-399, 2HH Y18
R 122VU 4HH Y19
R **ON A/C 401-499,
R R 122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC 49HH 51HH 50HH X22 X21Y18
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C ALL
FOR 34HH
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC 21HH 23HH 24HH 22HH W22W21Y21Y20
R **ON A/C 401-499,
R R 122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC 53HH 55HH 56HH 54HH W22W21 Y21Y20
**ON A/C ALL
4. Procedure_________
(Ref. Fig. 401/TASK 21-61-15-991-001)
Subtask 21-61-15-420-050
A. Installation of the Pack Outlet-Temperature Sensor
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Make sure that the removed packing (3) is in a good condition. If necessary replace the packing (3).
(3) Remove the blanking plugs from the disconnected line ends.
(4) Clean the component interface and/or the adjacent area.
(5) Apply a small quantity of COMMON GREASE (Material No. 04-012) to the contact faces of the pack outlet- temperature sensor (1) and to the packing (3).
(6) Put the packing (3) in position on the pack outlet-temperature sensor (1).
(7) Put the pack outlet-temperature sensor (1) in position in the condensor (4).
(8) TORQUE the pack outlet-temperature sensor (1) to between 0.5 and 1.0 m.daN (44.24 and 88.49 lbf.in).
(9) Wipe clean the excess COMMON GREASE (Material No. 04-012) from the pack outlet-temperature sensor (1) and safety with MISCELLANEOUS (Material No. 19-009).
(10) Remove the blanking caps and connect the electrical connector (2).
(11) Make sure that the work area is clean and clear of tool(s) and other items.
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
Subtask 21-61-15-865-053
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
R (1) FOR 13HH - 1HH, 2HH, 3HH, 4HH.
R (2) FOR 34HH - 21HH, 22HH, 23HH, 24HH.
R **ON A/C 401-499,
Subtask 21-61-15-865-053-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
R (1) FOR 13HH - 49HH, 50HH, 51HH, 52HH.
R (2) FOR 34HH
-53HH, 54HH, 55HH, 56HH.
**ON A/C ALL
Subtask 21-61-15-710-050
C. Do the operational test of the pack temperature control system (Ref. TASK 21-61-00-710-001).
5. Close-up
________
Subtask 21-61-15-410-051-A
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the access panel/s (Ref. TASK 53-35-13-400-002).
(a)
FOR 13HH
-191BB. 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(27)