• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:55来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

__ the washers (31) and the clamps (32) and (35).
 11 Put the spacers (33) in position and install the bolts (30)
__ and the washers (31) and the clamps (32).
 12 Put the cross beam (8) in position in the brackets (45) and
__
 (12) and install the quick-release pins (44) and (10). 13 Put the clamp (4) and the bellows (5) in position on the air
__ inlet (6).
 14 Make sure that the bellows (5) is in the correct position.
__
 15 TORQUE the clamp (4) to between 0.22 and 0.26 m.daN (19.46 and

__

 23.00 lbf.in). 16 Remove the blanking caps from the disconnected electrical
__ connectors.
 17 Make sure that the electrical connectors are clean and in the
__ correct condition.
 18 Connect the electrical connector (58).
__
 19 Remove the blanking plugs and connect the water injector

__ connector (57).
 1EFF : ALL 1 21-61-51Page 431 1 1 Aug 01/05R 1 1 1CES 1


 20__ Make sure that the work area is clean and clear of tool(s) and other items.
 (4) Do the adjustment of the ram air-inlet flap (Ref. TASK 21-61-51-820-001). 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 Subtask 21-61-51-865-055
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 
R  (1) FOR 8HH - 1HH, 2HH, 3HH, 4HH. 
R  (2) FOR 28HH - 21HH, 22HH, 23HH, 24HH: 
R  **ON A/C 401-499,
 Subtask 21-61-51-865-055-A
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 
R  (1) FOR 8HH - 49HH, 50HH, 51HH, 52HH. 
R  (2) FOR 28HH - 53HH, 54HH, 55HH, 56HH:
 **ON A/C ALL
 Subtask 21-61-51-710-051
 D. Do the operational test of the pack temperature control system (Ref. TASK 21-61-00-710-001).

 

 5. Close-up
________ Subtask 21-61-51-410-051-A
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the access panels (Ref. TASK 53-35-13-400-002).

 (a)
 For the Left air inlet,

 -191BB and 191KB.

 (b)
 For the Right air inlet,

 


 -192FB and 192KB. Subtask 21-61-51-862-052
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
 1EFF : ALL 1 21-61-51Page 433 1 1 Aug 01/05R 1 1 1CES 1


 TASK 21-61-51-000-003 Removal of the Air-Inlet Flap Mechanism WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______ FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
 NOTE : The procedure is the same for the left and the right air-inlet flap
____ mechanism.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-61-51-000-001 Removal of the Air-Inlet Flap Actuator 8HH and 28HH 21-61-51-200-003 Air-Inlet Flap Mechanism - In-Service Wear Limits 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
 External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure 21-61-51-991-008 Fig. 404
 3. Job Set-up
__________ Subtask 21-61-51-861-050
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
 1EFF : ALL 1 21-61-51Page 434 1 1 Aug 01/05R 1 1 1CES 1


 Subtask 21-61-51-865-059
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 8HH 
R  **ON A/C 401-499,
R  49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 52HH  D08 
R  122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC  1HH 3HH  X22X21 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(59)