 Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002).


 (2)
 Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).

 (3)
 Do the pre-conditioning through the HP ground connector (Ref. TASK 12-33-21-618-001) or with the APU (Ref. TASK 12-33-21-618-001)

 (4)
 On the AIR COND panel 30VU, make sure that:


 -the PACK 1 and PACK 2 pushbutton switches are in the off position (the OFF legends are on).
 4. Procedure
_________
 Subtask 21-63-00-710-058
 A. Operational Test of the Trim Air Check-Valves
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the ECAM control panel 11VU: On the ECAM bleed page:
 -push the BLEED page pushbutton  - the Pack 1 and Pack 2 outlet
 switch. temperatures are shown.

 2. On the AIR COND panel 30VU: On the AIR COND panel 30VU:
 -push the Pack 1 pushbutton  - the OFF legend is off.
 switch to on.

 On the ECAM Bleed page:
 -the Pack 2 outlet temperature does not increase (for approx. 90 seconds).
 3. On the AIR COND panel 30VU: On the AIR COND panel 30VU:
 -push the Pack 1 pushbutton  - the OFF legend is on.
 switch to OFF.

 1EFF : ALL 1 21-63-00Page 513 1 1 Aug 01/05R 1 1 1CES 1


 -------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
4. On the AIR COND panel 30VU: On the AIR COND panel 30VU:
 -Push the Pack 2 pushbutton  - the OFF legend is off.
 switch to on.

 On the ECAM Bleed page:
 -the Pack 1 outlet temperature does not increase (for approx. 90 seconds).
 5. Close-up
________
 Subtask 21-63-00-860-057
 A. Put the aircraft back to its initial configuration. Stop the pre-conditioning through the HP ground connector (Ref. TASK 12-33-21-618-001) or the APU (Ref. TASK 12-33-21-618-001)
 (1)
 Do the EIS stop procedure
 (Ref. TASK 31-60-00-860-002).


 (2)
 De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).

 

 1EFF : ALL 1 21-63-00Page 514 1 1 Aug 01/05R 1 1 1CES 1


 TASK 21-63-00-720-001
 1. Reason for the Job
 Functional Test of the Cockpit and Cabin Temperature Control without CFDS/MCDU. __________________ Self Explanatory
 2. Job Set-up Information______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
12-33-21-618-001  Pre-conditioning with the APU
 24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power
 24-41-00-862-002  De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure 21-63-00-991-001 Fig. 501
 3. Job Set-up
__________ Subtask 21-63-00-861-062
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
 1EFF : ALL 1 21-63-00Page 515 1 1 Aug 01/05R 1 1 1CES 1


 Subtask 21-63-00-865-063
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 49VU AIR COND/FLOW/CTL &/IND1  1HB  D07 
R  **ON A/C 401-499,
 49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC  52HH  D08 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
R  122VU AIR COND/FLOW/MIXER/FLAP 122VU AIR COND/FLOW/CTL AND IND/2 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  3HB 2HB 4HK 3HK 2HK 1HK 21HH 23HH 1HH 3HH 24HH 22HH  V22V21V20V19V18V17W22W21X22X21Y21Y20 
 