Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).
(3)
Do the pre-conditioning through the HP ground connector (Ref. TASK 12-33-21-618-001) or with the APU (Ref. TASK 12-33-21-618-001)
(4)
On the AIR COND panel 30VU, make sure that:
-the PACK 1 and PACK 2 pushbutton switches are in the off position (the OFF legends are on).
4. Procedure
_________
Subtask 21-63-00-710-058
A. Operational Test of the Trim Air Check-Valves
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the ECAM control panel 11VU: On the ECAM bleed page:
-push the BLEED page pushbutton - the Pack 1 and Pack 2 outlet
switch. temperatures are shown.
2. On the AIR COND panel 30VU: On the AIR COND panel 30VU:
-push the Pack 1 pushbutton - the OFF legend is off.
switch to on.
On the ECAM Bleed page:
-the Pack 2 outlet temperature does not increase (for approx. 90 seconds).
3. On the AIR COND panel 30VU: On the AIR COND panel 30VU:
-push the Pack 1 pushbutton - the OFF legend is on.
switch to OFF.
1EFF : ALL 1 21-63-00Page 513 1 1 Aug 01/05R 1 1 1CES 1
-------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
4. On the AIR COND panel 30VU: On the AIR COND panel 30VU:
-Push the Pack 2 pushbutton - the OFF legend is off.
switch to on.
On the ECAM Bleed page:
-the Pack 1 outlet temperature does not increase (for approx. 90 seconds).
5. Close-up
________
Subtask 21-63-00-860-057
A. Put the aircraft back to its initial configuration. Stop the pre-conditioning through the HP ground connector (Ref. TASK 12-33-21-618-001) or the APU (Ref. TASK 12-33-21-618-001)
(1)
Do the EIS stop procedure
(Ref. TASK 31-60-00-860-002).
(2)
De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002).
1EFF : ALL 1 21-63-00Page 514 1 1 Aug 01/05R 1 1 1CES 1
TASK 21-63-00-720-001
1. Reason for the Job
Functional Test of the Cockpit and Cabin Temperature Control without CFDS/MCDU. __________________ Self Explanatory
2. Job Set-up Information______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
12-33-21-618-001 Pre-conditioning with the APU
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure 21-63-00-991-001 Fig. 501
3. Job Set-up
__________ Subtask 21-63-00-861-062
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
1EFF : ALL 1 21-63-00Page 515 1 1 Aug 01/05R 1 1 1CES 1
Subtask 21-63-00-865-063
B. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
49VU AIR COND/FLOW/CTL &/IND1 1HB D07
R **ON A/C 401-499,
49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC 52HH D08
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
R 122VU AIR COND/FLOW/MIXER/FLAP 122VU AIR COND/FLOW/CTL AND IND/2 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC 3HB 2HB 4HK 3HK 2HK 1HK 21HH 23HH 1HH 3HH 24HH 22HH V22V21V20V19V18V17W22W21X22X21Y21Y20
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(129)