• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:55来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Subtask 21-63-19-865-052-A
 A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 49HH, 50HH, 51HH, 52HH, 53HH, 54HH, 55HH, 56HH.
 **ON A/C ALL
 Subtask 21-63-19-410-050
 B. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the access panel (Ref. TASK 25-54-12-400-001), 131PW.

 (3)
 Remove the access platform(s).

 (4)
 Close the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-002).


 Subtask 21-63-19-862-050
 C. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


 CONTROLLER - ZONE (8HK) - REMOVAL/INSTALLATION
______________________________________________ TASK 21-63-34-000-001 Removal of the Zone Controller (8HK)
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)
 No specific access platform 1 m (3 ft. 3 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power 21-63-34-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 21-63-34-861-050
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-63-34Page 401 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 Subtask 21-63-34-865-050


 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 4HK V20 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 3HK V19 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 2HK V18 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1 1HK V17
 Subtask 21-63-34-010-050
 C. Get Access
 (1)
 Put the access platform in position at the access door 811.

 (2)
 Open the access door 811.


 4. Procedure
_________ (Ref. Fig. 401/TASK 21-63-34-991-001) Subtask 21-63-34-020-050
 A. Removal of the Zone Controller
 (1)
 Loosen the nuts (4).

 (2)
 Lower the nuts (4).

 (3)
 Pull the zone controller (1) on its rack (3) to disconnect the electrical connectors (2).

 (4)
 Remove the zone controller (1) from its rack (3).

 (5)
 Put blanking caps on the disconnected electrical connectors.


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-63-34Page 402 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 Zone Controller
 Figure 401/TASK 21-63-34-991-001

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-63-34Page 403 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 TASK 21-63-34-400-001
 Installation of the Zone Controller (8HK)

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  access platform 1 m (3 ft. 3 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-63-00-710-004  Operational Test of the Cockpit and Cabin Temperature Control with CFDS/MCDU 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 21-63-34-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 21-63-34-860-050
 A. Aircraft Maintenance Configuration
 (1) Make sure that the ground service network is energized
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(148)