_ Subtask 21-61-52-862-052
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
 1EFF : ALL 1 21-61-52Page 444 1 1 May 01/05R 1 1 1CES 1


 ACTUATOR - AIR OUTLET FLAP (9HH,29HH) - ADJUSTMENT/TEST
_______________________________________________________
 TASK 21-61-52-820-001
 Adjustment of the Air Outlet Flap
 WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______
 FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
 HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.

 NOTE : The procedure is the same for the ram-air outlet flap actuator 9HH and
____
 29HH.

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)
R No specific Torque Wrench : range 0.00 to 1.20 m.daN
R (0.00 to 9.00 lbf.ft)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
21-61-00-710-001 Operational Test of the Pack Temperature-Control
 System 21-61-52-000-003 Removal of the Ram-Air Outlet 21-61-52-400-002 Installation of the Ram-Air Outlet Flap 21-61-52-400-003 Installation of the Ram-Air Outlet 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
 External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure
R 1EFF : 001-003, 051-054, 1 21-61-52Page 501 1 1 May 01/05 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------


53-35-13-400-002 Installation of the Quick-Release Access Panels on the Belly Fairing Structure 21-61-52-991-004 Fig. 501
 3. Job Set-up
__________
 Subtask 21-61-52-861-054
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
 Subtask 21-61-52-865-058
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 9HH
 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 1HH X22 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 3HH X21 122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC 4HH Y19 122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC 2HH Y18
 FOR 29HH 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 21HH W22 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 23HH W21 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 24HH Y21 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC 22HH Y20
 Subtask 21-61-52-010-053
 C. Remove the access panel (Ref. TASK 53-35-13-000-002).
 FOR 9HH
 191KB.

 FOR 29HH
 192KB.

R 1EFF : 001-003, 051-054, 1 21-61-52Page 502 1 1 May 01/05 1 1 1CES 1


 4. Procedure
_________
 Subtask 21-61-52-820-052
 A. Measurement and Adjustment of the Ram-Air Outlet Flap
 (Ref. Fig. 501/TASK 21-61-52-991-004)

 NOTE : To adjust the ram-air outlet flap you must only use the procedures
____ which follow. Do not try to adjust the ram-air flap by repositioning the flap operating lever around the flap splined shaft (Ref. TASK 21-61-52-400-002).
 (1)
 Disconnect the electrical connector (3).

 (2)
 Put blanking caps on the disconnected electrical connectors.

 (3)
 Initial Measurement

 (a)
 Measure the distance A between the end surface (9) of the flap actuator (4) and the shoulder of the jack screw (10) (Ref. Fig. Sheet 2).

 (b)
 On the base scale of the graph make a mark of this Measured Distance "A" (Ref. Fig. Sheet 3).

 (c)
 With the aid of the graph find the required distance 'B' (required ram-air outlet gap) on the vertical scale of the graph.

 (d)
 At the air outlet flap (11), measure the actual distance "B" (Ref. Fig. Sheet 2).

 


 NOTE : The measurement must be made with hand pressure applied to
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(85)