• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:55来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (1)
 Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002).


 (2)
 Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).


 4. Procedure
_________ Subtask 21-63-00-710-053
 A. Operational Test of the Zone-Controller (Back Up Switching) via CFDS/MCDU
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the panel 122VU: - open the circuit breakers 1HK and 3HK.  On the ECAM upper display unit, (afterapprx. 60 seconds):- the warning message COND ZONE REGUL FAULT comes on.
 2. On the ECAM control panel 11VU:
 - push one of the two CLR pushbutton switches. - the warning message goes off.
 On the ECAM lower display unit: - the status message CAB ZONE AT FIXED TEMP comes on.
 3. On the panel 122vu: - close the circuit breakers 1HK and 3HK. On the ECAM lower display unit:- the status message goes off.
 On the ECAM upper display unit: - the warning message COND HOT AIR FAULT may show. 

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-63-00Page 509 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 5. Close-up
________ Subtask 21-63-00-860-051
 A. Put the aircraft back to its initial configuration.
 (1)
 Do the EIS stop procedure
 (Ref. TASK 31-60-00-860-002).


 (2)
 De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-63-00Page 510 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 **ON A/C ALL


 TASK 21-63-00-710-005
 Operational Test of the Trim Air Check-Valves

 1.
 Reason for the Job

__________________
 Referenced from TSM


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-33-21-618-001 Pre-conditioning through the HP Ground Connection 12-33-21-618-001 Pre-conditioning with the APU 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
 External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power
 31-60-00-860-001 EIS Start Procedure
 31-60-00-860-002 EIS Stop Procedure

 3. Job Set-up
__________
 Subtask 21-63-00-865-073

 A. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------

R **ON A/C 401-499,
 49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC 52HH D08 R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 4HK V20


 -------------------------------------------------------------------------------
R  PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 3HK V19 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 2HK V18 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1 1HK V17 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 21HH W22 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 23HH W21 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 1HH X22 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 3HH X21 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 24HH Y21 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC 22HH Y20 
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302, 
R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC  4HH  Y19 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC  2HH  Y18 
R  **ON A/C 106-149, 303-399, 
R  122VU  4HH  Y19 
R  **ON A/C 401-499, 
R R R R R R R 122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC  53HH 55HH 49HH 51HH 56HH 54HH 50HH  W22 W21 X22 X21 Y21 Y20Y18 

 

 **ON A/C ALL
 Subtask 21-63-00-860-056
 B. Aircraft Maintenance Configuration
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(128)