-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC 50HH Y18 
 **ON A/C ALL 
 FOR 28HH  
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  21HH 23HH 24HH 22HH  W22W21Y21Y20  
R  **ON A/C 401-499, 
R R  122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC  53HH 55HH 56HH 54HH  W22W21 Y21Y20  
**ON A/C ALL 
 Subtask 21-61-00-220-050-A 
 C. Inspection of the Air Inlet Flap before Deactivation 
 (1) Measure the air inlet gap. (Ref. Fig. 401/TASK 21-61-00-991-004) 
 NOTE : Do not apply pressure to the air inlet flap when you do the____ measurement. 
 (a) If the air inlet gap is 40 mm (1.5748 in.) or over then the air inlet is considered open.
 Air Inlet Gap Measurement Figure 401/TASK 21-61-00-991-004 
 1EFF : 1 1R 1CES  ALL  1 11 1 21-61-00 Page 404 Feb 01/05
 Subtask 21-61-00-010-057
 D. Get Access
 (1) Remove the access panel (Ref. TASK 53-35-13-000-002).
 (a)
 FOR 8HH
-191KB.
 (b)
 FOR 28HH
 -192KB.
 4. Procedure
_________
 Subtask 21-61-00-040-050
 A. Deactivation of the Air Inlet Flap
 (1)
 Disconnect the electrical connector from the air inlet flap actuator 8HH (28HH) (Ref. TASK 21-61-51-000-001).
 (2)
 Put blanking caps on the disconnected electrical connectors.
 (3)
 Temporarily attach the loose electrical connector to the aircraft structure.
 (4)
 Put a warning notice in position in the cockpit to tell the flight crew that one air inlet flap is inoperative.
 5. Close-up
________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 Subtask 21-61-00-865-063
 A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): FOR 8HH 1HH, 2HH, 3HH, 4HH FOR 28HH 21HH, 22HH, 23HH, 24HHR **ON A/C 401-499,
 Subtask 21-61-00-865-063-A
 A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): FOR 8HH 49HH, 50HH, 51HH, 52HH FOR 28HH 53HH, 54HH, 55HH, 56HH
 **ON A/C ALL
 Subtask 21-61-00-869-053
 B. Cockpit Effects
 (1) On the upper ECAM DU the message AIR PACK 1 (PACK 2) REGUL FAULT will be displayed.
 Subtask 21-61-00-410-056
 C. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.
 (2)
 Close the access panel/s (Ref. TASK 53-35-13-400-002).
 (a)
 FOR 8HH
-191KB.
 (b)
 FOR 28HH
 -192KB.
 (3) Make an entry in the log book to record the deactivation.
 Subtask 21-61-00-862-052
D. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
 TASK 21-61-00-440-002
 Reactivation of the Air Inlet Flap
 WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______
 FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
 HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
 NOTE : The procedure is the same for the Left and the Right air inlet flaps.
____
 1. Reason for the Job
__________________
 Refer to the MMEL TASK: 21-52-02 a)
 Air cooling system
 Air conditioning pack
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-61-51-400-001 Installation of the Air-Inlet Flap Actuator 8HH and
 28HH 21-61-51-400-004 Installation of the Air Inlet Flap-Assembly 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(7)