D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
21-61-00-710-001 Operational Test of the Pack Temperature-Control System
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power
53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure
53-35-13-400-002 Installation of the Quick-Release Access Panels on the Belly Fairing Structure
21-61-13-991-001 Fig. 401
3. Job Set-up__________
Subtask 21-61-13-860-050
A. Aircraft Maintenance Configuration
(1)
Make sure that the aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002).
(2)
Make sure that the access panel/s is/are removed (Ref. TASK 53-35-13-000-002).
(a)
FOR 11HH
-191KB.
(b)
FOR 31HH
-192KB.
1EFF : ALL 1 21-61-13Page 407 1 1 Aug 01/05R 1 1 1CES 1
Subtask 21-61-13-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 11HH
R **ON A/C 401-499,
R 49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 52HH D08
R 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 1HH 3HH X22X21
R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302,
R R 122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 4HH Y19
R R 122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC **ON A/C 106-149, 303-399, 2HH Y18
R 122VU 4HH Y19
R **ON A/C 401-499,
R R 122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC 49HH 51HH 50HH X22 X21Y18
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C ALL
FOR 31HH
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC 21HH 23HH 24HH 22HH W22W21Y21Y20
R **ON A/C 401-499,
R R 122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC 53HH 55HH 56HH 54HH W22W21 Y21Y20
**ON A/C ALL
4. Procedure_________
(Ref. Fig. 401/TASK 21-61-13-991-001)
Subtask 21-61-13-420-050
A. Installation of the Water-Extractor Temperature Sensor
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Make sure that the removed packing (3) is in a good condition. If necessary replace the packing (3).