• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2010-09-02 13:46来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Step 3 – Determine if the unit requires a CE mark and/or an Electric Soft Start (call for soft start availability)
Step 4 – Choose a paint color from the available colors
Step 5 – Select quick disconnect couplings to attach the hoses to the aircraft bulkhead fittings. These couplings
will become part of the model number sequence, they are attached to hose ends upon receipt (pgs 77 & 78)
Step 6 – Determine the input voltage the Hydraulic Power Unit will be operating at. When ordering, the most common
error is selecting incorrect input voltages (To check input voltage, measure from L1 to L2, L1 to L3, and
L2 to L3. The highest voltage obtained from these readings is the correct input voltage)
Step 7 – Select additional features to customize your unit. We offer a broad range of options to enhance your Hydraulic
Power Unit to your particular needs or budget. Options listed in the chart must be in alphabetical order. Refer
to the option matrix (below) for standard features per model number
Hydraulic Power Units
Ordering Instructions
MANDATORY INFORMATION OPTIONS (alphabetical order)
5
Quick Disconnect (Hydraulic Couplings)
char build
0 Standard
1 CE Compliant
* 2 Standard Soft Start
* 3 CE Soft Start
* 58, 59, 5A, 5L Series ONLY
char fluid
1 MIL-PRF-5606
2 MIL-PRF-83282
3 Phosphate Ester (Skydrol, Hyjet)
4 MIL-PRF-87257
HYDRAULIC
POWER
UNIT
voltage input
char 3 phase freq cord
0 208V
1 220-240V
2 380-400V
3 440-480V
4 575V
5 200V
6 220-240V
7 380-400V
8 415V
9 440V
** Q 208V
** R 220-240V
** S 380-400V
** T 440-480V
** U 575V
** V 200V
** W 220-240V
** X 380-400V
** Y 415V
** Z 440V
** Consult factory for availability
char description
A 25 ft hoses
AA 25 ft hoses
C dual system
D dual system w/crossover check
E hourmeter (50HZ)
F hourmeter (60HZ)
G voltage monitor (200-230V)
H voltage monitor (380V)
I voltage monitor (415-460V)
J voltage monitor (575V)
** K pyrometer
** L electric reservoir level
** M hand pump
** N towing/trailer package
** P reservoir return
** Q calibration port
** R electric filter clogged indicatior
** S electric over temperature
** T return back pressure w/sight gauge
** U return sight gauge
** V return back pressure
** W return filter
** X height extension cart
** Y return sight gauge - dual system
** Z no return valves - dual system
** 1 return back pressure - dual system
** 2 return stack light
** Consult factory for availability
char color
0 desert sand
1 Tronair blue (standard)
2 safety yellow
3 red
4 jade green
5 snow white
6 UAL gray
7 NWA gray
8 international orange
9 olive drab
A Airbus blue
C olive drab - military
S special (call Tronair)
50 ft
(15.2 m)
input
cord
length
100 ft
(30.5 m)
input
cord
length
char gpm lpm psi bar hp kW FR
0 6 22.7 1800 124 3 2.24
1 6 22.7 3000 207 5 3.73
2 10 37.9 3000 207 15 11.2
3 11 41.6 5000 345 25 18.6
4 15 56.8 3500 241 25 18.6
J 20 75.7 4000 276 30 22.4
5 25 94.6 5000 345 75 55.9
6 34 129 3500 241 40 29.8 C
7 34 129 3500 241 75 55.9
8 50 189 3500 241 100 74.6
9 50 189 5000 345 150 112
A 65 246 3500 241 150 112
L 65 246 5000 345 150 112
B Citation pkg A 5 3.73
C Lear pkg (Lear 45) 20 14.9
D JPATS 10 7.46
E Pilatus 10 7.46
F Citation pkg B 3 2.24
G Gulfstream (factory) 75 55.9 C
H Dash 8-100/300 only 15 11.2 B
K Gulfstream (G100/200) 25 18.6 B
60HZ
50HZ
60HZ
50HZ
B
D
ENGINEERING & SURFACE TREATMENT SPECIALISTS
PRECISION
MANUFACTURING
INDUSTRIAL
AND
THERMAL COATINGS
AEROSPACE
SURFACE
TREATMENTS
GAS TURBINE
OVERHAUL
AND REPAIR
FABRICATION
AND
ASSEMBLY
MACHINING
SOLUTIONS
45 TYP
0.020”
0.090” -0.090”
0.7578” DIA REF
2
Hycrome was founded in 1947 from a long established family engineering business and commenced its principal development in
1951 when a Hard Chrome Plating facility was introduced to compliment the spring, wire forming and presswork manufacturing
facilities.
To service the requirements of this new plating department, our machine shop was developed to increase machining capacities
and introduce precision grinding, lapping and honing capabilities. Additionally, the metal finishing and metal spraying departments
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空资料32(38)