曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
(1) Move the speed brake lever to the ARMED position.
(a) Make sure the SPEED BRAKE ARMED light comes on.
SUBTASK 27-62-00-860-056
(2) Move the TEST SELECTOR switch to the INBD position on the antiskid/autobrake control unit
(AACU).
SUBTASK 27-62-00-860-057
(3) Push the ENABLE/VERIFY button and move the toggle switch to the PRESS/TEST position on the
AACU.
(a) Make sure the spoilers move to the UP position.
SUBTASK 27-62-00-860-208
WARNING: MAKE SURE THAT YOU OPEN THE CIRCUIT BREAKER FOR THE WEATHER RADAR
SYSTEM. THE FORWARD MOVEMENT OF A THRUST LEVER CAN CAUSE THE
AUTOMATIC OPERATION OF THE SYSTEM. THE OPERATION OF THIS SYSTEM CAN
CAUSE SERIOUS INJURY TO PERSONS AND DAMAGE TO EQUIPMENT IN THE AREA
OF THE NOSE RADOME.
(4) Open this circuit breaker and install safety tag:
F/O Electrical System Panel, P6-1
Row Col Number Name
D 13 C00120 WEATHER RADAR RT
SUBTASK 27-62-00-860-058
(5) Move the No. 1 thrust lever to the full forward position.
(a) Make sure all spoilers move to the down position.
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
EFFECTIVITY
GUN ALL 27-62-00
Page 545
Feb 10/2007
D633A101-GUN
BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details
(b) Make sure the speed brake lever moves to the DOWN position.
(c) Make sure the SPEED BRAKE ARMED and SPEED BRAKE DO NOT ARM lights are off.
SUBTASK 27-62-00-860-059
(6) Move the No. 1 thrust lever back to the idle position.
SUBTASK 27-62-00-860-060
(7) Release the ENABLE/VERIFY button and the PRESS/TEST switch on the AACU.
SUBTASK 27-62-00-860-061
(8) Do the test of the throttle switches again except move the TEST SELECTOR switch to the OUTBD
position on the AACU and use the No. 2 thrust lever.
SUBTASK 27-62-00-860-190
(9) Move the TEST SELECTOR switch to the NORM position on the AACU.
F. Put the Airplane Back to Its Usual Condition
SUBTASK 27-62-00-860-062
(1) Do this task: Put the Speed Brake Hydraulic systems A and B Back to the Condition Before
the Pressurization, TASK 27-62-00-840-801.
SUBTASK 27-62-00-860-063
(2) Close these circuit breakers:
F/O Electrical System Panel, P6-1
Row Col Number Name
D 13 C00120 WEATHER RADAR RT
F/O Electrical System Panel, P6-2
Row Col Number Name
B 14 C01070 FLIGHT CONTROL AUTOSLAT DC 2
C 14 C01068 FLIGHT CONTROL AUTOSLAT DC 1
SUBTASK 27-62-00-410-001
(3) Close this access panel:
Number Name/Location
117A Electronic Equipment Access Door
------------------------- END OF TASK ---------------------------
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
EFFECTIVITY
GUN ALL 27-62-00
Page 546
Feb 10/2007
D633A101-GUN
BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details
Antiskid/Autobrake Control Unit Adjustment
Figure 507 (Sheet 1 of 2)/27-62-00-990-808
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
EFFECTIVITY
GUN ALL 27-62-00
Page 547
Jun 10/2006
D633A101-GUN
BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details
Antiskid/Autobrake Control Unit Adjustment
Figure 507 (Sheet 2 of 2)/27-62-00-990-808
737-600/700/800/900
AIRCRAFT MAINTENANCE MANUAL
EFFECTIVITY
GUN ALL 27-62-00
Page 548
Jun 10/2006
D633A101-GUN
BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details
TASK 27-62-00-720-801
12. Engine Throttle Switch (S1) Functional Test
A. References
Reference Title
24-22-00-860-811 Supply Electrical Power (P/B 201)
27-62-00-800-801 Speed Brake Hydraulic Systems A and B Pressurization (P/B 201)
27-62-00-840-801 Put the Speed Brake Hydraulic systems A and B Back to the
Condition Before the Pressurization (P/B 201)
B. Location Zones
Zone Area
118 Electrical and Electronics Compartment - Right
211 Flight Compartment - Left
212 Flight Compartment - Right
C. Do a test of the Engine Throttle Switch (S1)
SUBTASK 27-62-00-700-003
(1) Do these steps to activate the auto speed brake system:
WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF ALL CONTROL
SURFACES BEFORE YOU SUPPLY HYDRAULIC POWER. AILERONS, RUDDERS,
ELEVATORS, FLAPS, SLATS, SPOILERS, LANDING GEAR, AND THRUST
REVERSERS CAN MOVE QUICKLY WHEN YOU SUPPLY HYDRAULIC POWER.
THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO EQUIPMENT.
(a) Do this task: Speed Brake Hydraulic Systems A and B Pressurization,
TASK 27-62-00-800-801.
(b) Do this task: Supply Electrical Power, TASK 24-22-00-860-811.
(c) Open these circuit breakers and install safety tags:
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
737-600-700-800-900 飞机维护手册6 AIRCRAFT MAINTENANCE MANUA(70)