(a) 415D35 UPR DK LAV FLUSH MOTOR U-21
D. Flush Switch Installation Test
S 864-018
(1)
Supply electrical power (AMM 24-22-00/201).
S 714-019
(2)
Turn the flush handle and make sure that the toilet flushes correctly.
S 864-020
(3)
Remove the electrical power if it is not necessary
(AMM 24-22-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú
38-32-64
ú ú 01 Page 403 ú Jun 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
TOILET TANK - REMOVAL/INSTALLATION
__________________________________
1. General_______
A. This procedure has two tasks. The first task removes the toilet tank. The second task installs the toilet tank.
B. Make sure that you read and obey the specified instructions in the Standard Procedures for work with the Toilet Waste and Equipment (AMM 38-32-60/201).
TASK 38-32-65-654-001
2. Toilet Tank___________
A. Reference
(1) AMM 12-17-61/301, Toilet Tank - Servicing
B. Access
(1) Location Zone 224 Upper Deck Crew Rest Body Sta 385 to 632, Right
C. Prepare for the Removal
S 864-002
(1)
Do the steps in AMM 12-17-61/301 to drain, rinse and add the chemical precharge to the toilet tank.
S 864-003
(2)
After 5 minutes, drain the chemical precharge from the toilet tank.
S 864-057
(3)
Open these circuit breakers and attach DO-NOT-CLOSE tags:
(a)
P414 Power Distribution Panel - Left 1) 414C15 LAV LIGHTS GHB 2) 414E19 DRAIN VALVE LAV TANK U-21 3) 414F23 FILL CONTROL LAV TANKS
(b)
P415 Power Distribution Panel - Right 1) 415D35 UPR DK LAV FLUSH MOTOR U-21
(4)
Open the latches at the bottom of the toilet shroud.
(5)
Remove the toilet shroud.
S 014-006
(6)
Do these steps to get access to the aft side of the toilet shroud wall.
S 014-004
S 014-005
NOTE:____The toilet shroud wall is the aft wall of the lavatory. It connects to the door wall.
(a) Remove the closure strip for the ceiling panel aft of the partition.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú
38-32-65
ú ú 01 Page 401 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
PARTITION INSTALLATION
SEE A
TOILET FLUSH TIMER
CEILING
PANEL CLOSURE STRIP
LATCHES ASSEMBLY
TOILET TANK
SHROUD TOILET SEE E
SCREW,
WASHER SIDEWALL
PANEL
GAP
COVER
LAVATORY
WALL DADO
PANEL
PARTITION
SEE B
SCREW,
WASHER COVER SCREW
(2 LOCATIONS) ASSEMBLY
SEE C
PARTITION INSTALLATION
A
Toilet Tank Installation
Figure 401 (Sheet 1)
G25888
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú
38-32-65
ú ú 01 Page 402 ú Feb 10/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL
COVER ASSEMBLY
C
Toilet Tank InstallationFigure 401 (Sheet 2)
G26313
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 气动系统 WATER/WASTE(67)