• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-14 09:56来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 38-11-65
 ú ú 02 Page 401 ú Jun 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

747-400
MAINTENANCE MANUAL

LATCH
ACCESS PANEL
SHUTOFF VALVE SEE A
SCREW, WASHER 
HOSE 
BRACKET 
INLET 
PIPE 
OUTLET  NUT 
PIPE  LOCKNUT 
SHUTOFF 
VALVE 
ELBOW 

Lavatory Shutoff Valve Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú

 38-11-65
 ú ú 01 Page 402 ú Jun 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
C25554
A
747-400 MAINTENANCE MANUAL
 S 024-027
 (4)  
Disconnect the elbow from the tee fitting at the bottom of the hot water heater.

 S 024-019

 (5)  
Disconnect the water pipes from the inlet and outlet sides of the shutoff valve.

 S 024-007

 (6)  
Remove the locknut that installs the shutoff valve in the bracket.

 S 024-009

 (7)  
Remove the shutoff valve.


 TASK 38-11-65-404-010
 3.  Lavatory Water Shutoff Valve Installation (Fig. 401)_________________________________________
 A. General
 (1)  The water shutoff valve for the lavatory will be referred to as the shutoff valve in this procedure.
 B. References
 (1)  
AMM 12-14-61/301, Water System Servicing

 (2)  
AMM 38-15-60/201, Water System Pressurization


 C. Access
 (1)  Location Zone 224 Upper Deck Crew Rest Body Sta 385 to 632, Right
 D. Procedure
 S 424-011
 (1)  
Put the shutoff valve in its installed position.

 S 714-012

 (2)  
Make sure that the handle can be freely turned from full open to the full closed position.

 (3)
Install the shutoff valve in the bracket and tighten the locknut.

 (4)  
Connect the water pipes to the shutoff valve.

 S 424-013

 (5)  
Connect the elbow to the tee fitting at the bottom of the hot water heater.

 (6)  
Make sure that the shutoff valve is closed.

 (7)
Do this task: "Water System Pressurization" (AMM 38-15-60/201).


 S 424-014
 S 424-012
 S 864-016
 S 614-024
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú

 38-11-65
 ú ú 02 Page 403 ú Jun 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (8)  S 864-025Make sure the water tanks are not empty.
 (9)  S 614-026If it is necessary, add water to the water tanks (AMM 12-14-61/301).
 S 864-018

 (10)
 Open the shutoff valve. S 154-019

 (11)
 Open the cold water faucet above the shutoff valve. S 874-020

 (12)
 Let the water run until it runs in a steady stream. S 864-021

 (13)
 Close the faucet. S 794-022

 (14)
 Do a check of the shutoff valve connections for leaks. S 414-023

 (15)
 Install the access panel.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú

 38-11-65
 ú ú 02 Page 404 ú Jun 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 LAVATORY BASIN FAUCET - MAINTENANCE PRACTICES
_____________________________________________
 1.  General_______
 A. This procedure gives the instructions for these tasks:
 (1)  
The removal and installation of the lavatory basin faucets.

 (2)  
The removal and installation of the cartridges for the lavatory basin faucets.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 气动系统 WATER/WASTE(15)