• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-14 09:56来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Pressurize the Pneumatic System with a ground air source.

 (b)  
Pressurize the Pneumatic System with APU.

 (c)  
Pressurize the Pneumatic System with one or more engines.

 

 (11)
 Make sure the flow is normal at the lavatory faucet.


 S 714-023
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú

 38-15-65
 ú ú 01 Page 405 ú Feb 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 794-024
 (12)
 Make sure there are no air leaks at the connections that were installed in the steps above.

 S 864-025

 (13)
 For the ceiling panels that were removed, do this task:  "Forward Cargo Container Compartment Ceiling and Sidewall Linings -Installation" (AMM 25-52-01/401).

 S 864-026

 (14)
 Do this task: "Water System Pressurization" (AMM 38-15-60/201).

 S 864-027

 (15)
 If pneumatic power is not necessary, do this task:  "Release the Pressure in the Pneumatic System (AMM 36-00-00/201).

 S 864-028

 (16)
 Remove electrical power is it is not necessary (AMM 24-22-00/201).


 TASK 38-15-65-004-029
 4.  Unloader Check Valve Removal (Fig. 401)____________________________
 A. References
 (1)  
AMM 25-52-01/401, Containerized Cargo Compartment Ceiling and Sidewall Linings

 (2)  
AMM 38-15-60/201, Water System Pressurization


 B. Access
 (1)  Location Zone 124 Forward Cargo Container Compartment Aft Half, Right
 C. Procedure
 S 864-030
 WARNING: MAKE SURE YOU REMOVE THE AIR PRESSURE FROM THE WATER
_______ PRESSURIZATION SYSTEM BEFORE YOU START TO REMOVE THE UNLOADER CHECK VALVE. AIR WITH HIGH PRESSURE AND TEMPERATURE CAN CAUSE INJURY TO PERSONS.
 (1)  
Do this task: "Water System Depressurization" (AMM 38-15-60/201).

 S 014-031

 (2)  
Do the "Containerized Cargo Compartment Ceiling and Sidewall Linings Removal" task (AMM 25-52-01/401) to remove the upper 12 inches of the RH vertical sidewall panels between stations 840 and 860.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú

 38-15-65
 ú ú 01 Page 406 ú Feb 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 014-032
 (3)  
Do the "Containerized Cargo Compartment Ceiling and Sidewall Linings Removal" task (AMM 25-52-01/401) to remove the ceiling panels adjacent to the sidewall panels that you removed.

 S 014-050

 (4)  
Find the 1/2-inch diameter airline that connects to the compressor to the unloader check valve.

 S 034-051

 (5)  
Remove the clamp that holds the 1/2-inch diameter air line to the floor beam at RBL 92.

 S 034-033

 (6)  
Remove the clamshell clamp from the coupling on the inlet side of the unloader check valve.

 S 034-034

 (7)  
Move the sleeve away from the unloader check valve.

 S 034-035

 (8)  
Remove the adapter from the inlet side of the unloader check valve.

 S 024-036

 (9)  
Remove the unloader check valve.

 S 034-037

 (10)
 Remove and discard the O-rings.


 TASK 38-15-65-404-038
 5.  Unloader Check Valve (Fig. 401)____________________
 A. Consumable Materials
 (1)  D00463 Lubricant - White Protopet 1S (Witco Corp, New York, NY 07804)
 B. References
 (1)  
AMM 24-22-00/201, Manual Control

 (2)  
AMM 25-52-01/401, Containerized Cargo Compartment Ceiling and Sidewall linings.

 (3)  
AMM 38-15-60/201, Water System Pressurization


 C. Access
 (1)  Location Zone 124 Forward Cargo Container Compartment Aft Half, Right
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 气动系统 WATER/WASTE(36)