• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-14 09:56来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Remove electrical power if it is not necessary (AMM 24-22-00/201).


 S 864-025
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú

 38-11-63
 ú ú 01 Page 405 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 WATER TANK - REMOVAL/INSTALLATION
_________________________________
 1.  General_______
 A.  This procedure gives the instructions for two tasks. The first task is for the removal of one or more water tank(s). The second task is the installation of the water tank(s).
 TASK 38-11-64-384-001
 2.  Water Tank Removal (Fig. 401)__________________
 A.  Standard Tools and Equipment
 (1)  Caps for the disconnected water and pressurization lines.
 B.  References
 (1)  
AMM 12-14-61/301, Water System

 (2)  
AMM 25-52-01/401, Containerized Cargo Compartment Ceiling and Sidewall Linings

 (3)  
AMM 38-15-60/201, Water System Pressurization


 C.  Access
 (1)  Location Zone 124 Forward Cargo Container Compartment Aft Half, Right
 D.  Procedure
 S 844-002
 (1)  Do this task: "Water System Servicing (Drain)" (AMM 12-14-61/301).
 S 864-003
 WARNING: MAKE SURE YOU REMOVE THE AIR PRESSURE FROM THE WATER
_______ PRESSURIZATION SYSTEM BEFORE YOU START TO REMOVE THE WATER TANK(S). AIR WITH HIGH PRESSURE AND TEMPERATURE CAN CAUSE INJURY TO PERSONS.
 (2)
Do this task: "Water System Depressurization (AMM 38-15-60/201).

 S 014-004

 (3)  
Do the "Containerized Cargo Compartment Ceiling and Sidewall Linings Removal" task (AMM 25-52-01/401) to remove the RH vertical sidewall panels between stations 820 and 860.

 S 014-005

 (4)  
Do the "Containerized Cargo Compartment Ceiling and Sidewall Linings Removal" task (AMM 25-52-01/401) to remove the ceiling panels adjacent to the sidewall panels that you removed.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú

 38-11-64
 ú ú 01 Page 401 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

LOCKWIRE INSTALLATION (EXAMPLE)

THERMOSTAT
HEATER
(EXAMPLE)
(EXAMPLE)
Water Tank Installation
Figure 401 (Sheet 1)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú

 38-11-64
 ú ú 01 Page 402 ú Feb 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
C24335
A
747-400 MAINTENANCE MANUAL
BOLT

TANK PLAIN
TANK SUPPORT
TEFLON WASHER


PLAIN TANK BOLTBOLTWASHER SUPPORT

TANK SUPPORT


TIGHTEN THE BOLT TO NOT MORE THAN 20 POUND - INCHES
APPLY A THIN LAYER OF BMS 3-24 GREASE TO THE SURFACE THAT TOUCHES THE PLAIN WASHER. DO NOT APPLY TO THE SURFACE THAT TOUCHES THE TEFLON WASHER
INSTALL THE BOLT WET WITH BMS 5-95 SEALANT
APPLY A THIN LAYER OF BMS 3-24 GREASE ON THE SURFACES THAT TOUCH

 

Water Tank Installation
Figure 401 (Sheet 2)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú

 38-11-64
 ú ú 01 Page 403 ú Feb 10/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
C24385
A 747-400 MAINTENANCE MANUAL
O-RING (2 LOCATIONS)

LOCKWIRE
INSTALLATION


Water Tank Installation
Figure 401 (Sheet 3)

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 气动系统 WATER/WASTE(12)