(f) Apply liberal amounts of corrosion preventive compound to all the inside support clevis surfaces. Remove the excess compound (Fig. 403).
NOTE: The support plate and the outer cylinder surfaces must
____ be coated with sufficient amounts of compound so that no air pockets exist between the support clevis and the cylinder lugs.
(g) Use the steering cylinder sling to hoist the assembled units into the mounted position on the nose gear (Fig. 404).
NOTE: Hold up the assembled units with the sling until you
____
complete the installation.
(h)
Lubricate the washer faces, the bolt shanks and the threads of the support plate attach bolts with corrosion preventive compound before installing the bolts (Fig. 403).
(i)
Install the support plates attach bolts (Fig. 403).
(j)
Tighten the support plates attach bolt nut 15 to 25 pound-feet above the driving torque.
S 624-015
(7)
Fillet seal support the attachment bolts as shown (Fig. 403)
S 414-016
(8)
Do this task: "Nose Gear Steering Collar Installation" (AMM 32-51-06/401).
S 414-017
(9)
Install the steering summing mechanism.
(a)
Position the steering summing mechanism in place on the steering actuator upper and lower support plates.
(b)
Install the bolt with the washers and the nut to secure the steering summing mechanism to the steering actuator upper and lower support plates.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
32-51-05
ALL ú ú 01 Page 411 ú Oct 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
(c) Install the pulleys.
1) Position the pulley forward of the cable (NWS2A on left and NWS2B on right) and move the pulley aft into the pulley bracket trapping the cable in pulley groove.
2) Insert the pulley bolt and install the nut and the cotter pin on the pulley bolt securing the pulley in the pulley bracket. Make sure the cable is seated in the pulley groove.
3) Repeat steps 1) and 2) for the pulley on the opposite side of the summing mechanism.
S 414-018
(10)
Do this task: "Steering Metering Valve Installation"
(AMM 32-51-04/401).
S 834-019
(11)
Install and rig the steering cables (NWS2A, NWS2B)## (AMM
32-51-00/501).
S 094-020
(12)
Remove the rig pin from the cable compensator.
F.
Test the nose gear steering system operation.
S 014-021
(1) Disconnect the nose gear torsion links at the apex