38-32-14
ALL ú ú 01 Page 401 ú Nov 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500
MAINTENANCE MANUAL
AFT SERVICE
PANEL
SEE A FLUSH PORT WASTE TANK DRAIN CAP
FITTING
SEE B
FORWARD SERVICE PANEL
SEE A
TOILET SERVICE PANEL (EXAMPLE)
A
O-RING
FLUSH PORT FITTING NIPPLE
CAP
LEVER
FLUSH PORT FITTING
B
Flush Port Nipple Installation
Figure 401
G16407
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
38-32-14
ALL ú ú 01 Page 402 ú Nov 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
S 024-007
(6) Remove the O-ring gasket and discard it.
TASK 38-32-14-404-016
3. Flush Port Nipple Installation (Fig. 401)______________________________
A. Consumable Materials
(1) D00504, VV-P-236 Lubricant
B. References
(1) AMM 12-17-00/301, Toilet
C. Procedure
(1) S 164-017Make sure the flush port fitting is clean.
(2) S 644-009Apply a thin layer of lubricant on a new O-ring gasket.
(3) S 424-010Install the o-ring gasket on the flush port fitting.
(4) S 424-011Turn the flush port nipple clockwise to install it on the flush port fitting.
(5) S 424-012Install a lockwire between the nipple and the cap structure.
(6) S 614-013Add precharge to the toilet tank (AMM 12-17-00/301)
(7) S 414-014Close the flush port cap.
(8) S 414-015Close the toilet service panel.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
38-32-14
ALL ú ú 01 Page 403 ú Nov 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
FLUSH PORT FITTING CAP - REMOVAL/INSTALLATION
_____________________________________________
1. General_______
A. This procedure gives the instructions to remove and install the cap for the flush port fitting.
TASK 38-32-16-004-001
2. Flush Port Fitting Cap Removal (Fig. 401)______________________________
A. Access
(1)
Location Zones
203 Nose Wheel Well
208 Foward Cargo Compartment
218 Aft Cargo Compartment
(2)
Access Panels
1104 Forward Toilet Panel
1502 Toilet Service Door
3105R Forward Nose Wheel Well Panel
B. Procedure
S 014-002
(1)
Open the door for the toilet service panel.
S 024-005
(2)
Open the cap of the flush port fitting assembly.
S 034-006
(3)
Remove the cotter pin from the hinge pin.
S 024-007
(4)
Remove the washer, the hinge pin, and the cap.
TASK 38-32-16-404-008
3. Flush Port Fitting Cap Installation (Fig. 401)___________________________________
A. Access
(1)
Location Zones
203 Nose Wheel Well
208 Foward Cargo Compartment
218 Aft Cargo Compartment
(2)
Access Panels
1104 Forward Toilet Panel
1502 Toilet Service Door
3105R Forward Nose Wheel Well Panel
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
38-32-16
ALL ú ú 01 Page 401 ú Nov 15/96
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 WATER AND WASTE(61)