• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-03 11:21来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

737-300/400/500MAINTENANCE MANUAL
 (7)  S 032-007Put a cap on the air hose to keep contamination out.
 (8)  S 012-008Remove the mounting screws for the pressure regulator.
 (9)  S 022-009Remove the pressure regulator from the bulkhead union.
 S 032-010

 (10)
 Put a cap on the bulkhead union to keep contamination out. S 022-011

 (11)
 Disconnect the air hose from the bulkhead elbow. S 032-012

 (12)
 Put a cap on the air hose to keep contamination out. S 022-013

 (13)
 Remove the bulkhead elbow. NOTE: Keep the bulkhead elbow for the installation.


____
 S 032-014
 (14)
 Put caps on the bulkhead elbow to keep contamination out. S 022-015

 (15)
 Disconnect the solid air line from the bulkhead tee. S 012-016

 (16)
 Remove the mounting screws for the pressure regulator. S 022-017

 (17)
 Remove the pressure regulator from the bulkhead tee. S 032-018

 (18)
 Put caps on the bulkhead tee to keep contamination out. S 032-019

 (19)
 Put a cap on the solid air line to keep contamination out.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 38-41-22
 ALL  ú ú 02 Page 203 ú Nov 12/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 TASK 38-41-22-402-006
 3. Pressure Regulator Installation
 A. Reference
 (1)  AMM 38-41-00/201, Water Tank Pressurization System
 B. Access
 (1)  Location Zone
 220 Aft Cargo Compartment Equipment Bay

 C. Procedure
 S 432-007
 (1)  
Remove the protective cap from the union.

 S 422-020

 (2)  
Install the pressure regulator on the bulkhead union; use a new O-ring.

 S 862-009

 (3)  
Hold the pressure regulator in its position and install the mounting screws.

 S 792-010

 (4)  
Remove the cap from the air hose.

 S 412-011

 (5)
Connect the air hose to the pressure regulator; use a new O-ring.

 (6)  
Remove the caps from the bulkhead tee.

 S 422-022

 (7)  
Install the pressure regulator onto the bulkhead tee; use a new O-ring.

 (8)  
Remove the cap from the solid air line.


 S 412-021
 S 412-023
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 38-41-22
 ALL  ú ú 01 Page 204 ú Jul 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
 S 412-024
 (9)  
Hold the pressure regulator in its position and install the mounting screws.

 S 432-025

 (10)
 Connect the solid air line to the bulkhead tee; use a new O-ring.

 S 412-026

 (11)
 Remove the caps from the bulkhead elbow.

 S 422-027

 (12)
 Install the bulkhead elbow on the pressure regulator; use a new O-ring.

 S 412-028

 (13)
 Remove the cap from the air hose.

 S 432-029

 (14)
 Connect the air hose to the bulkhead elbow; use a new O-ring.

 S 412-030

 (15)
 Close the water tank fill valve.

 S 432-031

 (16)
 Remove the DO-NOT-CLOSE tag and close the circuit breaker.

 S 452-032

 (17)
 Supply electrical power.

 S 462-033

 (18)
 Make sure the air compressor operates and pressurizes the potable-water system.

 S 462-034

 (19)
 Make sure the pressure regulator and its connections do not have a leak.


 S 412-043
 WARNING: OBEY THE INSTRUCTIONS IN THE CARGO LINING INSTALLATION
_______ PROCEDURE. INCORRECT INSTALLATION OF THE CARGO LINING CAN LET THE FIRE EXTINGUISHING AGENT OR SMOKE OUT OF THE CARGO COMPARTMENT DURING A FIRE.
 (20) Install the aft right bulkhead lining in the bulk cargo compartment.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 WATER AND WASTE(100)