• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 16:31来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 S 715-012
 (11) Do a test to make sure the drain mast heater operates correctly on the ground.
 (a) Feel the drain mast to make sure it is moderately warm.
 S 725-037
 (12)
 Do a test of the Aft Toilet Drain Gasket.

 (a)
Open the service panel for the aft lavatory.

 (b)
Make sure the toilet drain and cap are moderately warm.

 (c)
Close the service panel for the aft lavatory.

 

 (13)
 Put the airplane back to its initial condition.


 S 865-038
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 30-71-00
 ALL  ú ú 08 Page 503 ú Jul 12/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 RIBBON HEATER - REMOVAL/INSTALLATION
____________________________________
 1.  General_______
 A.  This procedure has two tasks, one for the removal and one for the installation of the water line and waste drain ribbon heaters.
 B.  The procedure is the same for all ribbon heaters.
 TASK 30-71-11-004-012
 2.  Ribbon Heater Removal_____________________
 A.  Procedure
 S 864-004
 (1)  
Open the circuit breakers for the heaters.

 S 014-005

 (2)  
Get access to the heater.

 S 034-006

 (3)  
Cut the ribbon heater electrical leads.


 NOTE:____Let the cut electrical leads stay where they are. This will help you to find the splice. Remove them when you make a splice with the new leads.
 S 034-014
 (4)  
Remove the tape which holds the heater to the water or drain line.

 S 024-015

 (5)  
Remove the ribbon heater from the water or drain line.


 (a)  Make a note of the location of the tape on the heater to help with the new heater installation.
 TASK 30-71-11-404-013
 3.  Ribbon Heater Installation__________________________
 A.  Consumable Materials
 (1)  G00134 Tape - Adhesive, Flame-Resistant, 1.5-inch wide 3M No. 474
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 30-71-11
 ALL  ú ú 01 Page 401 ú Nov 15/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 B. References
 (1)  AMM 24-22-00/201, Manual Control
 C. Procedure
 S 424-011
 CAUTION: INCORRECT INSTALLATION OF RIBBON HEATERS AND INSULATION CAN
_______
 CAUSE HEATER FAILURE OR DAMAGE.

 DO NOT LET RIBBON HEATERS HAVE AN OVERLAP.
 DO NOT INSTALL CLAMPS OR STRAPS FROM PLUMBING INSTALLATIONS OVER RIBBON HEATERS.
 SUPPLY 1.0 INCH MINIMUM CLEARANCE BETWEEN THE RIBBON HEATERS AND THE INSULATION. DO NOT INSTALL INSULATION BLANKETS OVER RIBBON HEATERS.
 ATTACH RIBBON HEATER TERMINAL BUTTONS WITH TWO LOOPS OF FLAME-RESISTANT ADHESIVE TAPE.
 ATTACH ELECTRICAL LEAD WIRES WITH A STRAP.
 IF THE HEATER IS TOO LONG, INCREASE THE NUMBER OF WRAPS, BUT DO NOT LET THE HEATER HAVE AN OVERLAP.
 (1)  Install the ribbon heater:
 (a)  
Put the ribbon heater in position on the water or drain line.

 (b)  
Attach one end of the heater with two loops of tape.

 (c)  
Wind the heater around the water or drain line.

 (d)  
Put tape along the length of the heater in the same locations as on the heater you removed.

 (e)  
Find the splice area and make a splice of the electrical leads.


 S 864-021
 (2)  
Close the circuit breakers which you opened during the removal procedure.

 (3)  
Supply electrical power (AMM 24-22-00/201).

 (4)  
Make sure that the heater becomes warm.


 S 864-016
 S 714-017
 NOTE: If the ambient temperature or the water line temperature is
____ above 45°F (7.2°C), it is necessary to cool the heater thermostat before the heater can become warm.
 S 414-018
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 防冰和排雨(99)