• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-02 16:31来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Location Zone
 101, 102 Control Cabin
 503, 603 Fan Cowl (Right Half)


 (2)  
Access Panels 5737 Fan Cowl Panel (Right Half) - Left Engine 5837 Fan Cowl Panel (Right Half) - Right Engine


 C. Procedure
 S 864-001
 (1)  Open these circuit breakers for the applicable engine and attach DO-NOT-CLOSE tags:
 (a)  P18 Panel 1) ENG COWL ANTI-ICE 2) ENG AND WING ANTI-ICE CONTROL 3) ENG IDLE CONTROL
 S 014-002
 (2)  
Open the right fan cowl panel on the applicable engine (Ref 71-11-02/201).

 S 024-003

 (3)  
Remove the TAI valve:

 (a)  
Disconnect the electrical connector from the valve.

 (b)  
Remove the clamps which attach the valve to the duct.

 (c)  
Remove the valve.

 (d)  
Remove the seals from the male flanges of the valve and the duct. Discard the seals.

 

 (4)  
Install caps on the ducts to prevent contamination.


 S 034-004
 TASK 30-21-11-404-007
 2.  TAI Valve Installation (Fig. 401)______________________
 A. Consumable Materials
 (1)  D00000, Lubricant - Graphite-Based, Dry Film (AMM 20-30-21/201)
 B. References
 (1)  30-21-00/501, Inlet Cowl Anti-Icing System
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 30-21-11
 ALL  ú ú 02 Page 401 ú Nov 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
SEE A
ELECTRICAL CONNECTOR
CLAMP TAI VALVE CLAMP
FWD 5TH STAGE DUCT
TAI DUCT TO
A
Inlet Cowl TAI Valve Installation Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 30-21-11
 ALL  ú ú 01 Page 402 ú Nov 15/96
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 (2)  71-11-02/201, Fan Cowl Panels (Opening and Closing)
 C. Access
 (1)  
Location Zone
 101, 102 Control Cabin
 503, 603 Fan Cowl (Right Half)


 (2)  
Access Panels
 5737 Fan Cowl Panel (Right Half) - Left Engine
 5837 Fan Cowl Panel (Right Half) - Right Engine

 

 D. Procedure
 S 434-008
 (1)  Remove the caps from the ducts.
 S 214-009
 CAUTION:_______BE CAREFUL WHEN YOU INSTALL THE SEALS. YOU CAN CAUSE DAMAGE TO THE SEALS IF YOU ARE NOT CAREFUL WITH THEM.
 (2)  Examine the seals and the flange surfaces which will touch the seals.
 (a)  
Make sure that there are no scratches, cuts, pits, or creases.

 (b)  
Make sure that there is no unwanted material.


 S 424-010
 (3)  Install the TAI valve:
 (a)  
Install the seals in the male flanges of the valve and the duct.

 (b)  
Lubricate the external flanges of the valve and the inner surfaces of the clamps.

 (c)  
Hold the valve in its position on the engine. 1) Align the valve flanges with the duct flanges to get a

 maximum gap of 0.03 inches between flanges.
 2) Install shims and washers if they are necessary.


 (d)  
Install the two clamps which attach the valve to the ducts.

 (e)  
Tighten the clamp bolts to 70-80 pound-inches.

 (f)  
Connect the electrical connector to the valve.


 S 864-013
 (4)  Remove the DO-NOT-CLOSE tags and close these circuit breakers for the applicable engine:
 (a)  P18 Panel
 1) ENG COWL ANTI-ICE
 2) ENG AND WING ANTI-ICE CONTROL
 3) ENG IDLE CONTROL

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 30-21-11
 ALL  ú ú 02 Page 403 ú Nov 15/97
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 防冰和排雨(44)