Subtask 55-32-11-010-051
C. Get Access
(1)
Put a warning notice in position to tell persons not to operate the flight controls.
(2)
Put the access platform in position.
(3)
Put the crane in position.
4. Procedure
_________ R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,
(Ref. Fig. 401/TASK 55-32-11-991-001-A)
**ON A/C 051-099,
(Ref. Fig. 401A/TASK 55-32-11-991-001) R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,
(Ref. Fig. 402/TASK 55-32-11-991-003)
**ON A/C 001-049, 101-105, 201-203,
Subtask 55-32-11-020-052-A
A. Removal of the Vertical Stabilizer Leading-Edge NOTE : The removal of the leading-edge panel (3) is described, the
____ removal of the leadig-edge panel (7) and (8) is the same.
(1)
Remove the self-adhesive discs from the hoisting points.
(2)
Remove the plastic plugs from the hoisting point.
(3)
Install the hoist fittings with the eye end out of the leading-edge panel.
(4)
Attach the sling SLING - DORSAL FIN, LEADING EDGES, END CAP (98D55307531001) to the hoist fittings and to the crane.
Vertical Stabilizer Leading-Edge Figure 401/TASK 55-32-11-991-001-A
R 1EFF : 001-049, 101-149, 151-199, 201-299, 1 55-32-11Page 404 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1
R Vertical Stabilizer Leading-Edge.
R Figure 401A/TASK 55-32-11-991-001
R 1EFF : 051-099, 1 55-32-11 Page 405
1 1 May 01/05
1 1
1CES 1
Installation of the Leading-Edge Steel Cover
Figure 402/TASK 55-32-11-991-003
R 1EFF : 001-049, 101-149, 151-199, 201-299, 1 55-32-11Page 406 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1
(5)
Operate the crane and slowly tighten the sling cables. Adjust the turnbuckles as necessary to get equal tension. Increase the cable tension to release the load from the screws (4).
(6)
Remove the screws (4) and the washers (6).
(7)
Remove the leading-edge panel (3) and lower it on an approved support.
(8) Remove the sling. R **ON A/C 051-099, 106-149, 151-199, 204-299, 301-399, 401-499,
Subtask 55-32-11-020-052
A. Removal of the Vertical Stabilizer Leading-Edge
(1)
Remove the self-adhesive discs from the hoisting points.
(2)
Remove the plastic plugs from the hoisting point.
(3)
Install the hoist fittings with the eye end out of the leading-edge panel.
(4)
Attach the sling SLING - DORSAL FIN, LEADING EDGES, END CAP (98D55307531001) to the hoist fittings and to the crane.
(5)
Operate the crane and slowly tighten the sling cables. Adjust the turnbuckles as necessary to get equal tension. Increase the cable tension to release the load from the screws (4).
(6)
Remove the screws (4).
(7)
Remove the leading-edge panel and lower it on an approved support.
(8)
Remove the sling.
**ON A/C ALL
TASK 55-32-11-400-001
Installation of the Vertical Stabilizer Leading-Edge
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______ ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
CAUTION : MAKE SURE YOU DO NOT DAMAGE THE ANTENNA.
_______
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific abrade tool No specific countersink tool No specific crane No specific drill No specific hot air blower No specific non metallic scraper No specific nonmetallic scraper No specific porous felt No specific roller
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM STABILIZERS 安定面(80)