• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 08:55来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 15CC, 5CC1, 5CC2, 14CC1, 14CC2
R 1EFF : 106-149, 159-199, 211-299, 301-399, 1 55-42-13Page 408 1401-499, 1Aug 01/05 1 1 1CES 1


 RUDDER FILLET FAIRING - DESCRIPTION AND OPERATION
_________________________________________________
R R R  1. General_______ The rudder fillet fairing is installed at the lower end of the rudder. It fills the gap between the rudder and the fuselage when the rudder is in a neutral position.
R  2. Component Location__________________ (Ref. Fig. 001) 
R R R R  3. Description___________ The rudder fillet fairing is triangular.It is installed with countersunk screws. The fairing assembly is made of laminations of glass-fiber reinforced plastic.

 

 Rudder Fillet Fairing
 Figure 001
 1EFF :  ALL  1  55-43-00 Page 2 
1  1  Feb 01/98
 1  1
 1CES  1

 

 RUDDER FILLET FAIRING - INSTL - REMOVAL/INSTALLATION
____________________________________________________ TASK 55-43-19-000-001 Removal of the Rudder Fillet Fairing WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______ CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific warning notices
 No specific access platform 5.0 m (16 ft. 5 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001  Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 55-43-19-991-001 Fig. 401


 3. Job Set-up
__________
 Subtask 55-43-19-010-050
 A. Get Access
 (1)
 Put the rudder pedals in a neutral position.

 (2)
 Make sure that the rudder trim control is set at the zero position.

 (3)
 Put the warning notices in the cockpit to tell persons not to operate the flight controls.

 (4)
 Put the access platform in position at Zone 326.


 Subtask 55-43-19-865-051
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY 15CE1 B11 49VU FLIGHT CONTROLS/THS/ACTR/MOT2 19CE2 B09 49VU FLIGHT CONTROLS/SEC1/NORM/SPLY 21CE1 B08 49VU AUTO FLT/FAC1/28VDC 5CC1 B04 49VU AUTO FLT/FAC1/26VAC 14CC1 B03
R 105VU FLIGHT CONTROLS/ELAC2/STBY SPLY 16CE2 A02 R 105VU FLT CTL/ELAC1/STBY SPLY 16CE1 A01 R 105VU FLT CTL/SEC1/STBY SPLY 22CE B01 R
 121VU AUTO FLT/RUDDER/TRIM/IND 15CC M20 121VU AUTO FLT/FAC2/28VDC 5CC2 M19 121VU AUTO FLT/FAC2/26VAC 14CC2 M18 121VU FLIGHT CONTROLS/SEC3/SPLY 21CE3 Q19 121VU FLIGHT CONTROLS/SEC2/SPLY 21CE2 Q18 121VU FLIGHT CONTROLS/THS ACTR/MOT3 19CE3 Q17 121VU FLIGHT CONTROLS/THS ACTR/MOT1 19CE1 Q16 121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY 15CE2 R20
 Subtask 55-43-19-864-050
 C. Depressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK 29-00-00-864-001).

 4. Procedure
_________

 (Ref. Fig. 401/TASK 55-43-19-991-001) Subtask 55-43-19-020-050
 A. Remove the Rudder Filet Fairing
 (1) Remove the screws (2) and the cover assembly (1).


 Rudder Fillet Fairing
 Figure 401/TASK 55-43-19-991-001
 1EFF :  ALL  1  55-43-19 Page 404 
1  1  Feb 01/98
 1  1
 1CES  1


 TASK 55-43-19-560-002


 Preparation of the Rudder Fillet Fairing for Installation
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM STABILIZERS 安定面(113)