Vertical Stabilizer Spar Box
Figure 001
1EFF : ALL 1 55-31-00 Page 2
1 1 Feb 01/98
1 1
1CES 1
SPAR BOX - VERTICAL STABILIZER - REMOVAL/INSTALLATION
_____________________________________________________
TASK 55-31-11-000-001
Removal of the Vertical Stabilizer
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU_______ START A TASK ON OR NEAR: - THE FLIGHT CONTROLS - THE FLIGHT CONTROL SURFACES - THE LANDING GEAR AND THE RELATED DOORS - COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE_______ CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF_______ CARBONFIBER REINFORCED PLASTIC.
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
RRR R R No specific No specific No specific No specific No specific No specific No specific No specific No specific SL90-314-5625 SL90-322-5625 98D27207516000 98D27207549000 98D55307503001 blanking plugscircuit breaker(s) safety clip(s) supportwarning noticeadjustable access platform 6 m (19 ft. 8 in.)crane 800 kg (1763.6976 lb) 1 CAP - BLANKING 1 CONTAINER 3 L(3/4 USGAL) 1 SCALE 1000 KG (2200 LB)1 TOOL - EXTRACTION, TAB WASHERS STA-LOK NSA54541 WRENCHES - NOTCHED, TIGHTENING OF NUTS NSA54541 RIGGING PIN SET1 PIN - RIGGING1 CENTERING BOLTS - VERT. STABILIZER
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
98D55307518000 1 SLING - R/I VERTICAL STABILIZER AND RUDDER R 98D55308369000 1 EXTRACTOR - BOLTS, VERTICAL STABILIZER
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 51-78-00-615-002 Aircraft Cleaning after a Hydraulic Fluid Leakage 53-45-11-000-001 Removal of the Dorsal Fin 321AL 53-55-11-000-001 Removal of the Fairings 323AL/323AR 53-55-12-000-001 Removal of the Rudder Fairings 325AL and 325AR 55-33-13-010-002 Opening/Removal of the Trailing Edge Access-Panels
325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and
325BR
55-43-19-000-001 Removal of the Rudder Fillet Fairing
55-31-11-991-005 Fig. 401
55-31-11-991-001 Fig. 402
55-31-11-991-002 Fig. 403
55-31-11-991-003 Fig. 404
55-31-11-991-006 Fig. 405
3. Job Set-up
__________
Subtask 55-31-11-864-050
A. Hydraulic Safety Procedure
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1)
Depressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK 29-00-00-864-001).
(2)
Depressurize the Green, Yellow and Blue hydraulic reservoir.
(3)
Obey the hydraulic safety procedure (Ref. TASK 29-00-00-910-002).
Subtask 55-31-11-865-050
B. Open, safety and tag this(these) circuit breaker(s): 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM STABILIZERS 安定面(73)