R THS Sparbox Internal Structure Inboard Fuselage Fairings Figure 601/TASK 55-10-00-991-001
1EFF : ALL 1 55-10-00Page 604 1 1 Feb 01/04 1 1 1CES 1
Subtask 55-10-00-410-050
B. Close Access
(1)
Close the access doors 312AR, 314AR. Subtask 55-10-00-942-050
C. Remove Ground Equipment
(1) Remove the warning notice(s).
(2)
Remove the access platform(s). Subtask 55-10-00-081-050
D. Remove Locking Pins
(1) Remove the PIN-SIDE STICK LOCKING from the CAPT and F/O side stick controllers.
Subtask 55-10-00-865-051
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 15CE1, 15CE2, 16CE1, 16CE2, 19CE1, 19CE2, 19CE3
1EFF : ALL 1 55-10-00Page 605 1 1 Aug 01/03R 1 1 1CES 1
TASK 55-10-00-210-002
R Detailed Inspection of Horizontal Stabilizer Internal Structure of Torque Box R Outboard of Fuselage Fairings, LH/RH
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE. WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______
MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR
DAMAGE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1.
Reason for the Job
__________________
Refer to the MPD TASK: 551019-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific variable access platform
No specific warning notices
98D27903500000 2 PIN-SIDE STICK LOCKING
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
29-10-00-864-001 Depressurize the Green Hydraulic System 29-10-00-864-002 Depressurize the Yellow Hydraulic System 29-10-00-864-003 Depressurize the Blue Hydraulic System 55-12-11-000-001 Removal of the Horizontal Stabilizer Leading Edge 55-12-11-400-001 Installation of the Horizontal Stabilizer Leading
Edge 55-13-11-000-001 Removal of the THS Trailing Edge Access Panels 55-13-11-400-001 Installation of the THS Trailing Edge Access Panels 55-14-11-000-001 Removal of the Tips 332AB/342AB 55-14-11-400-001 Installation of the Tips 332AB/342AB
R SRM 551100 PB 101 55-10-00-991-002 Fig. 602
3. Job Set-up
__________
Subtask 55-10-00-860-051
A. Depressurize Hydraulic Systems
(1) Depressurize the Green, the Yellow and the Blue hydraulic systems. (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK 29-10-00-864-003)
Subtask 55-10-00-865-052
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY 15CE1 B11 49VU FLIGHT CONTROLS/THS/ACTR/MOT2 19CE2 B09 105VU FLIGHT CONTROLS/ELAC2/STBY SPLY 16CE2 A02 105VU FLT CTL/ELAC1/STBY SPLY 16CE1 A01 121VU FLIGHT CONTROLS/THS ACTR/MOT3 19CE3 Q17 121VU FLIGHT CONTROLS/THS ACTR/MOT1 19CE1 Q16 121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY 15CE2 R20
Subtask 55-10-00-481-051
C. Install Locking Devices
(1) Put the PIN-SIDE STICK LOCKING in the CAPT and F/O side stick controllers.
Subtask 55-10-00-941-051
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM STABILIZERS 安定面(10)