• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 08:55来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R R R R R R  53-55-12-000-001 53-55-12-400-001 55-33-13-010-002 55-33-13-410-002 55-44-11-000-001 55-44-11-400-001 ASRM 55-41-00-101  Removal of the Rudder Fairings 325AL and 325ARInstallation of the Rudder Fairings 325AL and 325AR Opening/Removal of the Trailing Edge Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR Closing/Installation of the Trailing Edge Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BRRemoval of the Rudder TipInstallation of the Rudder Tip(for corrective action)

 

 3. Job Set-up__________ 
R  Subtask 55-40-00-010-051-A 
R  A. Get Access 
R  (1) Remove the rudder fairing 325AL (Ref. TASK 53-55-12-000-001). 
R R  (2) Open and safety the access panels 325DL, 325CL, 325BL (Ref. TASK 55-33-13-010-002). 
R  (3) Remove the access panel 325EL (Ref. TASK 55-33-13-010-002). 
R R  (4) Remove and discard the aluminum tape from the lightening holes in the front spar. 
R  (5) Remove the rudder tip 326AT (Ref. TASK 55-44-11-000-001).
 4. Procedure_________
 Subtask 55-40-00-210-052
 A. Inspection
 (1) Do a detailed visual inspection of the rudder side panels internal surfaces.
 NOTE : If you find damage refer to (Ref. ASRM 55-41-00-101).____
 5. Close-up________ 
R  Subtask 55-40-00-410-051-A 
R  A. Close Access 
R R  (1) Make sure that the work area is clean and clear of tool(s) and other items. 
R R  (2) Cut and install the SPECIAL MATERIALS (Material No. 05-015C) over the lighting holes on the front spar. 
R R  (3) Apply PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-001B) around the edge of the lighting hole covers. 
R  (4) Install the rudder tip 326AT (Ref. TASK 55-44-11-400-001).

 

R  (5) Close the access panels 325DL, 325CL, 325BL (Ref. TASK 55-33-13-410-
R  002). 
R  (6) Install the access panel 325EL (Ref. TASK 55-33-13-410-002). 
R  (7) Install the rudder fairing 325AL (Ref. TASK 53-55-12-400-001). 
R  (8) Remove the warning notice(s). 
R  (9) Remove the access platform(s). 
R  (10) Remove the ground support and maintenance equipment, the special and 
R  standard tools and all other items.


 TASK 55-40-00-210-004


 Detailed Visual Inspection of the Rudder Attach Fittings 1, 2, 3, 4 and 5 and the Rudder Actuator Attach Fittings 1, 2 and 3
 1. Reason for the Job
__________________
 Refer to the MPD TASK: 554005-01
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific lint-free cloth
 No specific warning notices
 No specific adjustable access platform 12 m (39 ft. 4 in.)

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R Material No. 11-002  USA MIL-PRF-680 DRY CLEANING SOLVENT (VARSOL/WHITE SPIRIT) (Ref. 20-31-00)
 Material No. 15-005  AIB TN 10138 TYPE I GRADE 2 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00)
 Material No. 15-006  AIB TN 10138 TYPE I GRADE 3 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00)


 C. Referenced Information

 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R R R R  29-00-00-864-001 55-33-13-010-002 55-33-13-410-002 ASRM 55-46-00-101 55-40-00-991-002  Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action Opening/Removal of the Trailing Edge Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR Closing/Installation of the Trailing Edge Access-Panels 325EL, 325ER, 325DL, 325DR, 325CL, 325CR, 325BL and 325BR(for corrective action)Fig. 602
 3. Job Set-up__________
 Subtask 55-40-00-860-050
 A. Aircraft Maintenance Configuration
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION_______ BEFORE YOU START A TASK ON OR NEAR: - THE FLIGHT CONTROLS - THE FLIGHT CONTROL SURFACES - THE LANDING GEAR AND THE RELATED DOORS - COMPONENTS THAT MOVE.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM STABILIZERS 安定面(107)