R Vertical Stabilizer Leading-Edge Figure 001
1EFF : 1 1 1CES ALL 1 111 55-32-00 Page 2 May 01/02
(2) Each leading edge section has a hoisting point. Each hoisting point has a threaded sleeve, which is bonded into the section. When the hoisting points are not in use a plastic plug is fitted in the threaded sleave and the hoisting points are covered by a self adhesive disc which makes a smooth surface with the leading edge.
LEADING EDGE - VERTICAL STABILIZER - REMOVAL/INSTALLATION
_________________________________________________________
TASK 55-32-11-000-001
Removal of the Vertical Stabilizer Leading-Edge
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
CAUTION : MAKE SURE YOU DO NOT DAMAGE THE ANTENNA.
_______
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform
No specific circuit breaker(s) safety clip(s)
No specific crane
No specific warning notice
98D55307531001 1 SLING - DORSAL FIN, LEADING EDGES, END CAP
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,
55-32-11-991-001-A Fig. 401 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 051-099,
55-32-11-991-001 Fig. 401A
R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,
55-32-11-991-003 Fig. 402
**ON A/C ALL
3. Job Set-up
__________
Subtask 55-32-11-865-050
A. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY 15CE1 B11 49VU FLIGHT CONTROLS/THS/ACTR/MOT2 19CE2 B09 49VU FLIGHT CONTROLS/SEC1/NORM/SPLY 21CE1 B08 49VU AUTO FLT/FAC1/28VDC 5CC1 B04 49VU AUTO FLT/FAC1/26VAC 14CC1 B03 105VU FLIGHT CONTROLS/ELAC2/STBY SPLY 16CE2 A02 105VU FLT CTL/ELAC1/STBY SPLY 16CE1 A01 105VU FLT CTL/SEC1/STBY SPLY 22CE B01 121VU AUTO FLT/RUDDER/TRIM/IND 15CC M20 121VU AUTO FLT/FAC2/28VDC 5CC2 M19 121VU AUTO FLT/FAC2/26VAC 14CC2 M18 121VU FLIGHT CONTROLS/SEC3/SPLY 21CE3 Q19 121VU FLIGHT CONTROLS/SEC2/SPLY 21CE2 Q18 121VU FLIGHT CONTROLS/THS ACTR/MOT3 19CE3 Q17 121VU FLIGHT CONTROLS/THS ACTR/MOT1 19CE1 Q16 121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY 15CE2 R20
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM STABILIZERS 安定面(79)