• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 08:55来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Polyurethane tape anti-erosion protection.
 1EFF : ALL 1 55-12-11Page 701 1 1 Aug 01/01R 1 1 1CES 1


 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific warning notices
 No specific Lint free cloth
 No specific access platform 4.0 m (13 ft. 1 in.)
 98D27903500000 2 PIN-SIDE STICK LOCKING

 B. Consumable Materials
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
Material No. 05-065 C Z-24.380 EROSION PROTECTIVE TAPE (Ref. 20-31-00) Material No. 08-017 GB S27-8006 BONDING METAL/METAL (Ref. 20-31-00) R Material No. 11-003 USA ASTM D 740 METHYL-ETHYL-KETONE (Ref. 20-31-00)
 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
29-10-00-864-001 Depressurize the Green Hydraulic System
 29-10-00-864-002 Depressurize the Yellow Hydraulic System
 29-10-00-864-003 Depressurize the Blue Hydraulic System
 51-75-12-300-001 Repair of Major Paint Damage on Light Alloy and

 Composite Material
 55-12-11-991-002 Fig. 701


 3. Job Set-up
__________

 Subtask 55-12-11-860-052
 A. Depressurize Hydraulic Systems
 (1) Depressurise the Green, Yellow and Blue hydraulic systems (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK 29-10-00-864-003).
 Subtask 55-12-11-865-052
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/THS/ACTR/MOT2 19CE2 B09 121VU FLIGHT CONTROLS/THS ACTR/MOT3 19CE3 Q17 121VU FLIGHT CONTROLS/THS ACTR/MOT1 19CE1 Q16
 Subtask 55-12-11-481-052
 C. Install Locking Devices
 (1) Install the PIN-SIDE STICK LOCKING in the CAPT and F/O side stick controllers.
 Subtask 55-12-11-941-052
 D. Safety Precautions
 (1)
 Put the warning notices in the flight compartment to tell persons not to operate the flight controls

 (2)
 Put the warning notices in position to tell persons not to operate the hydraulic systems.

 (3)
 Put the access platform in position at zone 334 for the left hand horizontal stabilizer leading edge and/or zone 344 for the right hand horizontal stabilizer leading edge.


 1EFF : ALL 1 55-12-11Page 703 1 1 Aug 01/01R 1 1 1CES 1

 4. Procedure
_________

 (Ref. Fig. 701/TASK 55-12-11-991-002)
 Subtask 55-12-11-110-052
 A. Cleaning.
 CAUTION : USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM_______ THE MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE SURFACE PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
 (1) Clean the leading edge surface with a Lint free cloth and CLEANING AGENTS (Material No. 11-003) - Apply the CLEANING AGENTS (Material No. 11-003) to the cloth, not the cloth to the CLEANING AGENTS (Material No. 11-003). This will prevent the transfer of contamination. - Carefully clean a small area at a time and remove the CLEANING AGENTS (Material No. 11-003) before it becomes dry. Use a new lint free cloth frequently to make sure that the dirt and contamination is not put back on the surface. - If necessary use a soft brush to clean out any holes.
 (2) When the area is clean, wash it with fresh clean water.
 (3) Carefully dry the area with a new, dry, lint free cloth.
 Subtask 55-12-11-370-050-B
 B. Treatment before the Repair of Polyurethane Tape 3M.
 (1) If the paint or primer layers are damaged do a repair. (Ref. TASK 51-75-12-300-001).
 (2) Apply new polyurethane tape SPECIAL MATERIALS (Material No. 05-065) to the leading edge surface. (Ref. TASK 51-75-12-300-001)
 (3) Seal the edges of the tape with BONDING AND ADHESIVE COMPOUNDS (Material No. 08-017). 
R R R  NOTE : No edge sealer: once the PU tape has been applied, the____ aircraft can fly immediatelly. However, we would recommend to wait one hour in order to allow a better adhesion of the tape. 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM STABILIZERS 安定面(21)