E. Aircraft Configuration
(1)
Connect the isolation coupling of the PTU (Ref. TASK 29-23-00-860-002).
(2)
Pressurize the applicable hydraulic reservoirs (Ref. TASK 29-14-00-614-002).
Subtask 32-43-27-710-050
F. Test
(1)
Do an operational test of the alternate braking system (Ref. TASK 32-43-00-710-001).
(2)
Make sure that there are no hydraulic leaks at the interface of the alternate brake manifold and the servovalve.
5. Close-up
________ Subtask 32-43-27-942-050
A. Removal of Equipment
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Remove the safety barriers.
(3)
Remove the warning notice(s).
(4)
Remove the access platform(s).
(5)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-43-27Page 410 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 MANIFOLD - ALTERNATE BRAKE SERVOVALVE (2614GM,2615GM) - REMOVAL/INSTALLATION
____________________________________________________________________________
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
TASK 32-43-31-000-001
Removal of the Alternate-Brake Servovalve Manifold 2614GM(2615GM)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
No specific blanking plugs
No specific circuit breaker(s) safety clip(s)
No specific safety barriers
No specific warning notice
No specific access platform 3 m (9 ft. 10 in.)
No specific container 5 l (1.3208 USgal)
1EFF : ALL 1 32-43-31Page 401 1 1 Aug 01/05 1 1 1CES 1
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 29-23-00-860-001 32-00-00-481-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance ActionDisconnection of the Isolation Coupling of the Power Transfer Unit (PTU)Installation of the Safety Devices on the Landing Gears
**ON A/C 001-002, 051-052,
32-43-31-991-001 Fig. 401
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
Post SB 32-1190 For A/C 001-002,051-052,
32-43-31-991-004 Fig. 402
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
3. Job Set-up__________
**ON A/C 001-002, 051-052,
(Ref. Fig. 401/TASK 32-43-31-991-001)
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
Post SB 32-1190 For A/C 001-002,051-052,
(Ref. Fig. 402/TASK 32-43-31-991-004)
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-43-31Page 402 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1
Alternate-Brake Servovalve Manifold 2614GM(2615GM)
Figure 401/TASK 32-43-31-991-001
R 1EFF : 001-002, 051-052, 1 32-43-31Page 403 1 1 May 01/05 1 1 1CES 1
Alternate-Brake Servovalve Manifold 2614GM(2615GM)
Figure 402/TASK 32-43-31-991-004
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-43-31Page 404 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
Subtask 32-43-31-941-051
A. Safety Precautions
(1)
Put the safety barriers in position.
(2)
Make sure that the ground safety locks are installed on the landing gear (Ref. TASK 32-00-00-481-001).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架7(92)