B. Get Access
(1) Put an access platform in position at the access door 811.
(2) Open the access door 811. Subtask 32-42-47-865-050
C. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY 4GG M36 121VU HYDRAULIC/BRAKING AND STEERING/SYS2/CTL 3GG M35 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/CTL 1GG M34 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY 2GG M33
Subtask 32-42-47-941-051
D. Put warning notices to tell persons not to operate the brake pedals
4. Procedure
_________ (Ref. Fig. 401/TASK 32-42-47-991-001) Subtask 32-42-47-481-050
A. Install the PIN, RIGGING - RUDDER CONTROL (98A27901002000) (14) Subtask 32-42-47-020-050
B. Removal of the Transmitter Unit (13)
(1)
Cut and remove the lockwire and disconnect the electrical connector (12).
(2)
Put the blanking plugs on the disconnected line ends.
(3)
Remove and discard the cotter pins (9).
(4)
Remove the nuts (8) and the washers (7).
(5)
Remove the bolts (3) and disengage the rods (6).
1EFF : ALL 1 32-42-47Page 402 1 1 Feb 01/98 1 1 1CES 1
Brake Pedal Transmitter Unit
Figure 401/TASK 32-42-47-991-001
1EFF : ALL 1 32-42-47 Page 403
1 1 Feb 01/98
1 1
1CES 1
(6)
Remove and discard the cotter pins (5).
(7)
Hold the transmitter unit (13), remove the nuts (11), the washers (10), the bolts (1) and the transmitter unit (13).
1EFF : ALL 1 32-42-47Page 404 1 1 Feb 01/98 1 1 1CES 1 1EFF : ALL 1 32-42-47Page 405 1 1 Aug 01/05 1 1 1CES 1
TASK 32-42-47-400-001
Installation of the Transmitter Unit - Brake Pedal (9GG)
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING_______ GEAR.
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.8 m (5 ft. 11 in.)
B. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
R R 5 5 9 9 cotter pin cotter pin cotter pin cotter pin 32-42-01 03 -030 32-42-01 03A-03032-42-01 06 -010 32-42-01 06A-010
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R 24-42-00-861-001 32-42-00-710-001 32-46-00-740-001 32-42-47-991-001 Energize the Ground Service Network from the External Power Operational Check of the Normal Braking System BITE Test of the BSCUFig. 401
3. Job Set-up
__________ Subtask 32-42-47-860-050
A. Aircraft Maintenance Configuration
(1)
Make sure that the Ground Service Network is energized (Ref. TASK 24-42-00-861-001).
(2)
Make sure that the access platform is in position at the access door
811.
(3)
Make sure that the access door 811 is open.
(4)
Make sure that the warning notice is in position in the cockpit to tell persons not to operate the brake pedals.
Subtask 32-42-47-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架7(32)