(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Install the transmitter unit (13) on its mounting.
(4)
Install the bolts (1), the washers (10) and the nuts (11).
(5)
Tighten and safety the nuts (11) with the cotter pin (5).
1EFF : ALL 1 32-42-47Page 406 1 1 Nov 01/00R 1 1 1CES 1
(6)
Align the rods (6) with the levers (2).
(7)
Install the bolts (3), the washers (7) and the nuts (8).
(8)
Tighten the nuts (8) and safety them with the cotter pin (9).
(9)
Remove the blanking caps from the electrical connectors.
(10) Make sure that the electrical connectors are clean and in the correct condition.
R (11) Connect the electrical connector (12) to the transmitter unit (13). R
Subtask 32-42-47-081-050
B. Remove the PIN, RIGGING - RUDDER CONTROL (98A27901002000) (14).
Subtask 32-42-47-865-053
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1GG, 2GG, 3GG, 4GG
Subtask 32-42-47-740-050
D. Test
(1)
Do the BITE test with the system 1 and system 2 of the BSCU (Ref. TASK 32-46-00-740-001).
(2)
Do the operational test of the normal braking system (Ref. TASK 32-42-00-710-001).
5. Close-up
________
Subtask 32-42-47-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Close the access door 811.
(3)
Remove the warning notice(s).
1EFF : ALL 1 32-42-47Page 407 1 1 Nov 01/00 1 1 1CES 1
(4) Remove the access platform(s).
1EFF : ALL 1 32-42-47Page 408 1 1 Nov 01/00R 1 1 1CES 1
R SERVOVALVE - NORMAL BRAKE (15GG,16GG,17GG,18GG) - REMOVAL/INSTALLATION
______________________________________________________________________
TASK 32-42-48-000-001
Removal of the Normal Brake Servovalve
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. Reason for the Job
__________________
R R Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
No specific blanking plugs
No specific circuit breaker(s) safety clip(s)
No specific cover
No specific safety barriers
No specific warning notice
No specific warning notices
No specific access platform 2.5 m (8 ft. 2 in.)
No specific container 2 l (0.5283 USgal)
1EFF : ALL 1 32-42-48Page 401 1 1 Aug 01/04 1 1 1CES 1
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
29-10-00-864-001 Depressurize the Green Hydraulic System 29-10-00-864-002 Depressurize the Yellow Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-23-00-860-001 Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU) 32-00-00-481-001 Installation of the Safety Devices on the Landing Gears 32-42-48-991-001 Fig. 401
3. Job Set-up
__________
(Ref. Fig. 401/TASK 32-42-48-991-001)
Subtask 32-42-48-941-050
A. Safety Precautions
R (1) Put the safety barriers in position.
(2)
Make sure that the safety locks are on the landing gear (Ref. TASK 32-00-00-481-001).