 System 32-43-32-991-003 Fig. 402
 3. Job Set-up
__________
 Subtask 32-43-32-941-054
 A. Safety Precautions
 (1)
 Make sure that the safety barriers are in position.

 (2)
 Make sure that the ground safety locks are installed on the landing gear (Ref. TASK 32-00-00-481-001).

 (3)
 On the panel 400VU:

 -
make sure that the landing-gear control-lever 6GA is in the DOWN position

 -
make sure that the warning notice is in position to tell persons not to operate the landing gear.

 


 1EFF : 401-499, 1 32-43-32Page 417 1 1 Aug 01/05 1 1 1CES 1


 (4) Make sure that the warning notice is in position to tell persons not

 to pressurize the Yellow hydraulic system.
 Subtask 32-43-32-860-055
 B. Aircraft Maintenance Configuration
 (1)
 Make sure that the access platform is below the applicable false rear spar, at zone 571(671).

 (2)
 Make sure that the Yellow hydraulic system has been depressurized (Ref. TASK 29-00-00-864-001).

 (3)
 Make sure that the pressure in the brake accumulator of the Yellow hydraulic system is at zero.

 (4)
 Make sure that the isolation coupling of the PTU is disconnected (Ref. TASK 29-23-00-860-001).


 Subtask 32-43-32-865-054
 C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU ABCU &/Y BRK/PRESS IND 61GG C10 121VU HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY 4GG M36 121VU HYDRAULIC/BRAKING AND STEERING/SYS2/CTL 3GG M35 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/CTL 1GG M34 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY 2GG M33 121VU HYDRAULIC/PARK BRK/CTL/STBY 71GG N37 121VU HYDRAULIC/PARK BRK/CTL/NORM 70GG N36 121VU HYDRAULIC/HYD POWER/Y 3803GX N30 121VU ABCU/HOT BUS/SPLY 110GG P30 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
 1EFF : 401-499, 1 32-43-32Page 418 1 1 Aug 01/05 1 1 1CES 1


 4. Procedure
_________
 (Ref. Fig. 402/TASK 32-43-32-991-003) Subtask 32-43-32-420-052
 A. Preparation for Installation
 (1)
 Clean the component interface and/or the adjacent area with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026).

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Make sure that the parts retained from the removed component are clean and in the correct condition.


 Subtask 32-43-32-420-053
 B. Installation of the Alternate Brake Manifold Filter
 (1)
 Install the new packing (4) and the new back-up ring (5) onto the new filter (3).

 (2)
 Install the filter (3) in the manifold.

 (3)
 Install the new packing (2) on the plug (1).

 (4)
 Install the plug (1) and TORQUE to between 3.85 and 4.0 m.daN (28.39 and 29.49 lbf.ft).


 (5) Safety the plug (1) with MISCELLANEOUS (Material No. 19-010). Subtask 32-43-32-865-055
 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1GG, 2GG, 3GG, 4GG, 61GG, 70GG, 71GG, 110GG, 3801GX, 3802GX, 3803GX
 Subtask 32-43-32-870-052
 D. Preparation for Test
 (1)
 Connect the isolation coupling of the PTU (Ref. TASK 29-23-00-860-002).

 (2)
 Bleed the alternate brake system (Ref. TASK 32-43-00-870-002).


 1EFF : 401-499, 1 32-43-32Page 419 1 1 Aug 01/05 1 1 1CES 1


 (3) Make sure that the work area is clean and clear of tool(s) and other

 items. Subtask 32-43-32-710-052
 E. Test
 (1)
 Do an operational test of the alternate brake system (Ref. TASK 32-43-00-710-001).

 (2)
 Make sure that there are no leaks from the plug (1).

 (3)
 Apply SEALANTS (Material No. 09-016) between the plug (1) and the manifold body.


 5. Close-up
________ Subtask 32-43-32-942-052
 A. Removal of Equipment
 (1)
 Remove the safety barriers.

 (2)
 Remove the warning notice(s).

 (3)
 Remove the access platform(s).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 1EFF : 401-499, 1 32-43-32Page 420 1 1 Aug 01/05 1 1 1CES 1


 