• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 18:04来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (1)
 Apply corrosion protection to the heads of the bolts, the connectors and the adjacent areas (Ref. TASK 51-75-13-916-002).

 (2)
 Remove the container.

 (3)
 Remove the warning notice(s).

 (4)
 Remove the access platform(s).

 (5)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (6)
 Close the right MLG door (Ref. TASK 32-12-00-410-001).

 (7)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-45-51Page 414 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 CONTROL SWITCH - PARKING BRAKE (73GG) - REMOVAL/INSTALLATION
____________________________________________________________ TASK 32-45-52-000-001 Removal of the Parking Brake Control Switch (73GG) WARNING : MAKE SURE THAT THE WHEEL CHOCKS ARE IN POSITION.
_______
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING

_______ GEAR.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) DMC519 1 ELECTRICIAN SERVICE TOOL KIT
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
32-45-52-991-002 Fig. 401
 3. Job Set-up
__________ Subtask 32-45-52-865-050
 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/PARK BRK/CTL/STBY 71GG N37 121VU HYDRAULIC/PARK BRK/CTL/NORM 70GG N36
 1EFF : ALL 1 32-45-52Page 401 1 1 Feb 01/98 1 1 1CES 1


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架7(172)