(1)
Apply corrosion protection to the heads of the bolts, the connectors and the adjacent areas (Ref. TASK 51-75-13-916-002).
(2)
Remove the container.
(3)
Remove the warning notice(s).
(4)
Remove the access platform(s).
(5)
Make sure that the work area is clean and clear of tool(s) and other items.
(6)
Close the right MLG door (Ref. TASK 32-12-00-410-001).
(7)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-45-51Page 414 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1
CONTROL SWITCH - PARKING BRAKE (73GG) - REMOVAL/INSTALLATION
____________________________________________________________ TASK 32-45-52-000-001 Removal of the Parking Brake Control Switch (73GG) WARNING : MAKE SURE THAT THE WHEEL CHOCKS ARE IN POSITION.
_______
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) DMC519 1 ELECTRICIAN SERVICE TOOL KIT
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
32-45-52-991-002 Fig. 401
3. Job Set-up
__________ Subtask 32-45-52-865-050
A. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/PARK BRK/CTL/STBY 71GG N37 121VU HYDRAULIC/PARK BRK/CTL/NORM 70GG N36
1EFF : ALL 1 32-45-52Page 401 1 1 Feb 01/98 1 1 1CES 1