(5)
Mark the bolts with PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-010).
(6)
Install the clamps (7) and (14) on the pressure transducers (3) and (16).
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-44-18Page 409 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1
(7)
Attach the bonding straps (10) and (11) with the washers (5) and (12), the bolts (4) and (13) and the nuts (6) and (9) (Ref. TASK 20-28-00-912-004).
(8)
Remove the blanking caps.
(9)
Make sure that the electrical connectors are clean and in the correct condition.
(10) Connect the electrical connectors (8) and (15) to the pressure transducers (3) and (16).
Subtask 32-44-18-865-053
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1GG, 2GG, 3GG, 4GG, 61GG, 70GG, 71GG, 3700GD, 3701GD, 3801GX, 3802GX, 3803GX.
Subtask 32-44-18-860-052
C. Preparation for Test
(1) Connect the PTU isolation coupling (Ref. TASK 29-23-00-860-002). Subtask 32-44-18-870-051
D. Bleed the high-pressure alternate braking system (Ref. TASK 32-43-00-870-002).
Subtask 32-44-18-710-050
E. Test
(1)
Do the operational test of the alternate braking system (Ref. TASK 32-43-00-710-001).
(2)
Make sure that there is no hydraulic fluid leakage from the pressure transducers 62GG and 63GG.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-44-18Page 410 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1
5. Close-up
________ Subtask 32-44-18-410-050
A. Close Access
(1)
Apply corrosion protection to the heads of the bolts and the adjacent areas (Ref. TASK 51-75-13-916-002).
(2)
Remove the container.
(3)
Remove the access platform(s).
(4)
Remove the warning notice(s).
(5)
Make sure that the work area is clean and clear of tool(s) and other items.
(6)
Close the right MLG door (Ref. TASK 32-12-00-410-001).
(7)
If necessary fill the reservoir of the Yellow hydraulic system to the correct level (Ref. TASK 12-12-29-611-001).
(8)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-44-18Page 411 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 PRESSURE TRANSDUCER - BRAKE YELLOW (100GG,101GG) - REMOVAL/INSTALLATION
_______________________________________________________________________
TASK 32-44-19-000-001
Removal of the Pressure Transducer 100GG(101GG)
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific blanking plugs No specific circuit breaker(s) safety clip(s) No specific safety barriers No specific warning notice No specific access platform 3.0 m (9 ft. 10 in.) No specific container 5 l (1.3208 USgal)
1EFF : 401-499, 1 32-44-19Page 401 1 1 Aug 01/05 1 1 1CES 1
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-23-00-860-001 Disconnection of the Isolation Coupling of the Power
Transfer Unit (PTU) 32-00-00-481-001 Installation of the Safety Devices on the Landing Gears 32-44-19-991-001 Fig. 401
3. Job Set-up
__________
Subtask 32-44-19-941-050
A. Safety Precautions
(1)
Put the safety barriers in position.
(2)
Make sure that the ground safety locks are installed on the landing gear (Ref. TASK 32-00-00-481-001).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架7(144)