• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 18:04来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-43-12Page 402 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 Hydraulic Reservoir
 Figure 401/TASK 32-43-12-991-003

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-43-12Page 403 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 (8) Install the seal (22) and the plug (23) on the valve (21).
 4. Procedure
_________
 (Ref. Fig. 402/TASK 32-43-12-991-001, 403/TASK 32-43-12-991-002) Subtask 32-43-12-020-051
 A. Removal of the Brake Control Master Cylinder (2625GM,2626GM)
 (1)
 Disconnect the hose (17).

 (2)
 Put a blanking plug on the disconnected line end.

 (3)
 Disconnect the hose (10).

 (4)
 Put a blanking plug on the disconnected line end.

 (5)
 Remove the cotter pin (16) from the nut (15) and discard it.

 (6)
 Remove the nut (15) and the washer (14).

 (7)
 Remove the screw (11) and the washer (12).

 (8)
 Remove the cotter pin (5) from the nut (4) and discard it.

 (9)
 Remove the nut (4) and the washer (3).


 (10)
 Remove the screw (1) and the washer (2).

 (11)
 Remove the master cylinder (13).

 (12)
 Loosen the nuts (7) and remove the elbows (6) from the master cylinder (13).

 (13)
 Remove and discard the washer-packings (8) and the packings (9).


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-43-12Page 404 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 Brake Control Master Cylinder
 Figure 402/TASK 32-43-12-991-001

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-43-12Page 405 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 Brake Control Master Cylinder
 Figure 403/TASK 32-43-12-991-002

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-43-12Page 406 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 TASK 32-43-12-400-001


 Installation of the Brake Control Master Cylinder (2625GM,2626GM)
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific warning notice
 No specific access platform 2.0 m (6 ft. 7 in.)
 No specific container 5 l (1.3208 USgal)
 No specific Torque Wrench : range 0.00 to 1.20 m.daN

 (0.00 to 9.00 lbf.ft) No specific Torque Wrench : range 0.20 to 3.60 m.daN
 (2.00 to 26.00 lbf.ft)
 B. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
5 cotter pin 32-43-01 02 -150 8 washer-packings 32-43-01 02 -140 9 packings 32-43-01 02 -060 16 cotter pin 32-43-01 02 -150
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-43-12Page 407 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
20-23-11-911-002 Installation of the Swivel plug-in unions and of O-Ring and Backup Washer on Swivel Plug-in Union 24-42-00-861-001 Energize the Ground Service Network from the External Power 32-43-00-612-001 Filling and bleeding of the Low Pressure Control
 System of the Alternate Braking 32-43-00-710-001 Operational Check of Alternate Braking System 32-43-12-991-001 Fig. 402 32-43-12-991-002 Fig. 403
 3. Job Set-up
__________
 Subtask 32-43-12-860-050
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).

 (2)
 Make sure that the warning notice which tells persons not to operate the brake pedals is in position in the cockpit.

 (3)
 Make sure that access platform is in position at the access door 811.

 (4)
 Make sure that the access door 811 is open.

 (5)
 Make sure that the container is in position below the removed master cylinder.


 4. Procedure
_________
 Subtask 32-43-12-420-050
 A. Installation of the Brake Control Master Cylinder (2625GM,2626GM)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架7(74)