• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 18:04来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (1) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-
002).
 5. Close-up________
 Subtask 32-45-00-942-050
 A. Removal of Equipment
 (1) Remove the warning notices.

 

 VALVE - PARKING BRAKE OPERATED (2579GM) - REMOVAL/INSTALLATION
______________________________________________________________ TASK 32-45-14-000-001 Removal of the Parking Brake Valve 2579GM WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______ YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE. WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs
 No specific circuit breaker(s) safety clip(s)
 No specific warning notices
 No specific access platform 2 m (6 ft. 7 in.)
 No specific container 5 l (1.3208 USgal)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-45-14Page 401 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-910-002 Safety Procedures of the Hydraulic System 29-10-00-864-002 Depressurize the Yellow Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-23-00-860-001 Disconnection of the Isolation Coupling of the Power
 Transfer Unit (PTU) 32-12-00-010-001 Open the Main Gear Doors for Access 32-44-11-200-001 Check Nitrogen Charge Pressure On Parking/Emergency
 Accumulator By Reading Gauge 32-45-14-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 32-45-14-860-050
 A. Aircraft Maintenance Configuration
 (1)
 Depressurize the Yellow hydraulic system (Ref. TASK 29-10-00-864-002).

 (2)
 Push the pressure release button on the pressure relief valve 3067GM to depressurize the alternate brake system.

 (3)
 Make sure that the pressure on the gauge 2585GM decreases to the fill pressure of the accumulator 2582GM (Ref. TASK 32-44-11-200-001).


 Subtask 32-45-14-010-050
 B. Get Access
 (1) Open the right MLG door (Ref. TASK 32-12-00-010-001). Subtask 32-45-14-869-050
 C. Disconnection of the PTU Isolation Coupling
 (1)
 Depressurize the reservoir of the Yellow hydraulic system (Ref. TASK 29-14-00-614-001).

 (2)
 Disconnect the PTU isolation coupling (Ref. TASK 29-23-00-860-001).

 (3)
 Put the access platform in position.


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-45-14Page 402 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 (4) Put the container below the parking brake valve 2579GM to collect the hydraulic fluid leakage.
 Subtask 32-45-14-865-050
 D. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU L/G/Y BRK/PRESS/IND 61GG C10 121VU HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY 4GG M36 121VU HYDRAULIC/BRAKING AND STEERING/SYS2/CTL 3GG M35 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/CTL 1GG M34 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY 2GG M33 121VU HYDRAULIC/PARK BRK/CTL/STBY 71GG N37 121VU HYDRAULIC/PARK BRK/CTL/NORM 70GG N36 121VU HYDRAULIC/HYD POWER/Y 3803GX N30 121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG 3700GD Q37 121VU HYDRAULIC/Y HYD/PUMP ENG2/CTL 3701GD Q36 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
 Subtask 32-45-14-941-050
 E. Safety Precautions
 (1) Put the warning notices in position to tell persons not to pressurize the Yellow hydraulic system: - on the panel 40VU in the cockpit, - on the ground service panel of the Yellow hydraulic system.
 4. Procedure_________
 (Ref. Fig. 401/TASK 32-45-14-991-001)
 Subtask 32-45-14-020-050
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架7(158)