 Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).

 (2)
 Make sure that the warning notice to tell persons not to operate the brake pedals is in position in the cockpit.

 (3)
 Make sure that the access platform is in position at the access door

 811.

 (4)
 Make sure that the access door 811 is open.


 4. Procedure
_________ (Ref. Fig. 401/TASK 32-43-11-991-001) Subtask 32-43-11-560-050
 A. Preparation of the Brake Control Reservoir before Installation
 (1)
 Make sure that the parts retained from the removed component are clean and in the correct condition.

 (2)
 Remove the blanking plugs from the bleed screw (15) and the union (9).


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-43-11Page 406 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 (3)
 Apply HYDRAULIC FLUIDS (Material No. 02-003):

 -
to the threads of the union (11)

 -
to the threads of the bleed screw (15)

 -
to the new packing (10).

 -
to the new washer-seal (14).

 

 (4)
 Install the union (11) and the new packing (10) on the union (9) of the brake control reservoir (1).

 (5)
 TORQUE the union (11) to between 1.1 and 1.2 m.daN (97.34 and 106.19 lbf.in).


 Subtask 32-43-11-420-050
 B. Installation of the Brake Control Hydraulic Reservoir (1)
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Put the brake control reservoir (1) in position on its support (4).

 (4)
 Install the bolts (2), the washers (3), the nuts (5) and tighten.

 (5)
 Remove the blanking plugs from the disconnected line ends.

 (6)
 Install the new washer-seal (14) in the drain hose union (13).

 (7)
 Connect the drain hose (13) to the bleed screw (15).

 (8)
 TORQUE the drain hose to 1.5 m.daN (11.06 lbf.ft).

 (9)
 Connect the hydraulic hose (12) to the union (11).


 (10) TORQUE the hydraulic hose (12) to between 1.5 and 1.7 m.daN (11.06 and 12.53 lbf.ft).
 Subtask 32-43-11-612-050
 C. Fill the alternate-braking control system (Ref. TASK 32-43-00-612-001). Subtask 32-43-11-710-050
 D. Operational test
 (1) Do the operational test of the alternate braking system. (Ref. TASK 32-43-00-710-001)
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-43-11Page 407 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 5. Close-up
________ Subtask 32-43-11-410-050
 A. Close access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the access door 811.

 (3)
 Remove the access platform(s).

 (4)
 Remove the warning notice(s).


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-43-11Page 408 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 HYDRAULIC RESERVOIR - BRAKE CONTROL (2624GM) - INSPECTION/CHECK
_______________________________________________________________ TASK 32-43-11-210-001 Check Fluid Level of Low Pressure Brake Reservoir
 1. Reason for the Job
__________________
 Refer to the MPD TASK: 324311-01
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice No specific wheel chocks No specific access platform 1.7 m (5 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-12-32-611-002  Replenishment of the Alternate Brake Reservoir (2624GM) 32-43-11-991-002 Fig. 601
 3. Job Set-up
__________ Subtask 32-43-11-867-050
 A. Aircraft Maintenance Configuration
 (1)
 On the panel 400VU, make sure that the landing-gear control-lever is in the DOWN position.

 (2)
 On the panel 110VU, make sure that the PARK BRK control switch is in the OFF position.


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-43-11Page 601 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 Subtask 32-43-11-941-053
 