• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 18:04来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R (4) On the panel 110VU, make sure that the PARK BRK control switch is at R OFF.
R (5) Pressurize the Yellow hydraulic system (Ref. TASK 29-10-00-863-002).
R 1EFF : 401-499, 1 32-44-00Page 502 1 1 Aug 01/05 1 1 1CES 1


R  (6) Make sure that the Green hydraulic system is depressurized (Ref. TASK 
R  29-10-00-864-001). 
R  Subtask 32-44-00-941-052 
R  C. Safety Precautions 
R  (1) Put the warning notice(s) in position to tell persons not to: 
R  - operate the landing gear control lever, 
R  - pressurize the Green hydraulic system. 
R  4. Procedure_________ 
R  Subtask 32-44-00-710-051 
R  A. Operational Test of the Alternate Braking without Anti Skid 
R  -------------------------------------------------------------------------------
R  ACTION  RESULT 
R  -------------------------------------------------------------------------------

R  1. Push in the two brake pedals on  On the panel 400VU, the brake yellow 
R  the CAPT or F/O side.  pressure triple indicator shows the 
R  left and right side pressure values. 
R  The pistons related to the Yellow 
R  hydraulic system are extended. 
R  2. Release the brake pedals.  The triple indicator shows that the 
R  pressure supplied to the brakes 
R  decreases to zero. 
R  The pistons related to the Yellow 
R  hydraulic system are retracted. 
R  3. Slowly push the brake pedals on  On the panel 400VU: 
R  the CAPT or F/O side.  - the pressure supplied to the brakes 
R  increases in proportion to the 
R  pressure you put on the pedals, 
R  - the pressure shown at full pedal 
R  movement is between 870 psi (60 bar) 
R  and 1160 psi (80 bar). 
R  4. Release the brake pedals 

R 1EFF : 401-499, 1 32-44-00Page 503 1 1 Aug 01/05 1 1 1CES 1


R  Subtask 32-44-00-860-054 
R  B. Aircraft Maintenance Configuration 
R  (1) Depressurize the Yellow hydraulic systems (Ref. TASK 29-23-00-864-
R  001). 
R  (2) On the panel 110VU, put the PARK BRK control switch at ON. 
R  5. Close-up________ 
R  Subtask 32-44-00-942-051 
R  A. Removal of Equipment 
R  (1) Remove the warning notice(s). 
R  (2) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-
R  002). 

R 1EFF : 401-499, 1 32-44-00Page 504 1 1 Aug 01/05 1 1 1CES 1R **ON A/C ALL


 TASK 32-44-00-720-002
 Functional Check of the Brake Accumulator System with the Parking Brake not applied WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
 CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.

 WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
 OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.

 WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______ THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY HYDRAULIC POWER TO THE AIRCRAFT.
 WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
 YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.

 1. Reason for the Job
__________________
 Refer to the MPD TASK: 324500-03
 To do a leakage test of the brake accumulator system

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice(s)
 1EFF : ALL 1 32-44-00Page 505 1 1 Aug 01/05 1 1 1CES 1 1EFF : ALL 1 32-44-00Page 506 1 1 Aug 01/05 1 1 1CES 1 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-210,


 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 24-41-00-862-002 32-44-11-200-001 TSM 32-44-00-810-808  Energize the Aircraft Electrical Circuits from the External PowerDe-energize the Aircraft Electrical Circuits Supplied from the External PowerCheck Nitrogen Charge Pressure On Parking/Emergency Accumulator By Reading Gauge(for corrective action)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架7(119)