Bonding Strap Inspection Report Sheet
R Figure 659/TASK 28-00-00-991-121
1EFF : 301-399, 1 28-00-00 Page A614
1 1 Nov 01/04
1 1
1CES 1
Manhole Access, Wing Fuel Tanks
R Figure 660/TASK 28-00-00-991-122
1EFF : 301-399, 1 28-00-00 Page A615
1 1 Nov 01/04
1 1
1CES 1
Fuel Quantity Indicator Harness, Fuel Sensor and Probe Locations R Figure 661/TASK 28-00-00-991-123
1EFF : 301-399, 1 28-00-00Page A616 1 1 Nov 01/04 1 1 1CES 1
Water Drain Valve and Magnetic Level Indicator Locations R Figure 662/TASK 28-00-00-991-124
1EFF : 301-399, 1 28-00-00Page A617 1 1 Nov 01/04 1 1 1CES 1 1EFF : 301-399, 1 28-00-00Page A618 1 1 Nov 01/04 1 1 1CES 1 Subtask 28-00-00-650-054
(d) For the bonding locations in the wing tanks:
R (Ref. Fig. 663/TASK 28-00-00-991-071, 664/TASK 28-00-00-991-072,
R 665/TASK 28-00-00-991-073, 666/TASK 28-00-00-991-074, 667/TASK
R 28-00-00-991-075, 668/TASK 28-00-00-991-076, 669/TASK 28-00-00-
R 991-077, 670/TASK 28-00-00-991-078, 671/TASK 28-00-00-991-079,
R 672/TASK 28-00-00-991-080, 673/TASK 28-00-00-991-081, 674/TASK
R 28-00-00-991-082, 675/TASK 28-00-00-991-083, 676/TASK 28-00-00-
R 991-084, 677/TASK 28-00-00-991-085, 678/TASK 28-00-00-991-086,
R 679/TASK 28-00-00-991-087, 680/TASK 28-00-00-991-088, 681/TASK
R 28-00-00-991-089, 682/TASK 28-00-00-991-090, 683/TASK 28-00-00-
R 991-091, 684/TASK 28-00-00-991-092, 685/TASK 28-00-00-991-093,
R 686/TASK 28-00-00-991-094, 687/TASK 28-00-00-991-095, 688/TASK
R 28-00-00-991-096, 689/TASK 28-00-00-991-097, 690/TASK 28-00-00-
R 991-098, 691/TASK 28-00-00-991-099, 692/TASK 28-00-00-991-100,
R 693/TASK 28-00-00-991-101, 694/TASK 28-00-00-991-102, 695/TASK
R 28-00-00-991-103, 696/TASK 28-00-00-991-104, 697/TASK 28-00-00-
R 991-105, 698/TASK 28-00-00-991-106, 699/TASK 28-00-00-991-107,
R A600/TASK 28-00-00-991-108, A601/TASK 28-00-00-991-109, A602/TASK
R 28-00-00-991-110, A603/TASK 28-00-00-991-111, A604/TASK 28-00-00-
R 991-112, A605/TASK 28-00-00-991-113, A606/TASK 28-00-00-991-114,
R A607/TASK 28-00-00-991-115, A608/TASK 28-00-00-991-116, A609/TASK
R 28-00-00-991-117, A610/TASK 28-00-00-991-118, A611/TASK 28-00-00-
R 991-119, A612/TASK 28-00-00-991-120)
R (e) For the bonding locations in the center tank:
R (Ref. Fig. 657/TASK 28-00-00-991-130, 658/TASK 28-00-00-991-131)
5. Close-up________
Subtask 28-00-00-410-062
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R (2) Close access to the applicable fuel tank (Ref. TASK 28-10-00-910-
002).
(3) Install the applicable access panels:
(a) For the LH and RH wing (Ref. TASK 57-27-11-400-001) and
(Ref. TASK 57-27-11-400-002).
R (b) For the center tank (Ref. TASK 57-17-11-400-001).
B. Fuel Configuration
(1) Refuel the aircraft (Ref. TASK 12-11-28-650-003). Subtask 28-00-00-942-056
C. Removal of Equipment
(1)
Remove the safety barriers.
(2)
Remove the access platform(s).
(3)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
1EFF : 301-399, 1 28-00-00Page A619 1 1 Nov 01/04R 1 1 1CES 1
Bonding Detail, RIB 1 to RIB 2, Left Hand R Figure 663/TASK 28-00-00-991-071- 12 (SHEET 1)
1EFF : 301-399, 1 28-00-00Page A620 1 1 Nov 01/04 1 1 1CES 1
Bonding Detail, RIB 1 to RIB 2, Left Hand R Figure 663/TASK 28-00-00-991-071- 22 (SHEET 2)
1EFF : 301-399, 1 28-00-00Page A621 1 1 Nov 01/04 1 1 1CES 1
Bonding Detail, RIB 2 to RIB 3, Left Hand R Figure 664/TASK 28-00-00-991-072- 12 (SHEET 1)
1EFF : 301-399, 1 28-00-00Page A622 1 1 Nov 01/04 1 1 1CES 1
Bonding Detail, RIB 2 to RIB 3, Left Hand R Figure 664/TASK 28-00-00-991-072- 22 (SHEET 2)
1EFF : 301-399, 1 28-00-00Page A623 1 1 Nov 01/04 1 1 1CES 1
Bonding Detail, RIB 3 to RIB 4, Left Hand R Figure 665/TASK 28-00-00-991-073- 12 (SHEET 1)
1EFF : 301-399, 1 28-00-00Page A624 1 1 Nov 01/04 1 1 1CES 1
Bonding Detail, RIB 3 to RIB 4, Left Hand R Figure 665/TASK 28-00-00-991-073- 22 (SHEET 2)