• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:45来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (6)
 Install the applicable access panel (Ref. TASK 28-10-00-910-002) (Ref. TASK 57-27-11-400-001):


 - on the left wing 540AB
 - on the right wing 640AB.

 Subtask 28-11-00-650-106
 B. Fuel Configuration
 (1) Refuel the aircraft as necessary (Ref. TASK 12-11-28-650-003). Subtask 28-11-00-942-051
 C. Removal of Equipment
 (1)
 Remove the safety barriers.

 (2)
 Remove the access platform(s).

 (3)
 Remove the warning notice(s).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 1EFF : ALL 1 28-11-00Page 605 1 1 Feb 01/98 1 1 1CES 1 TASK 28-11-00-200-002


R  Check Leak Monitor for Evidence of Fuel Leakage and Correct Closure of the Valve
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1. Reason for the Job
__________________
 Refer to the MPD TASK: 281100-02
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific safety barriers
 No specific warning notice
 98A28104000000 1 WATER DRAIN PURGER

 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
12-32-28-281-001 Drain Water Content
 28-00-00-910-001 Fuel Safety Procedures
 28-11-00-991-001 Fig. 602

 1EFF : ALL 1 28-11-00Page 606 1 1 Feb 01/04 1 1 1CES 1


 3. Job Set-up
__________
 Subtask 28-11-00-941-077

 A. Safety Precautions
 WARNING : OBEY THE FUEL SAFETY PROCEDURES.

_______
 (1)
 You must obey the fuel safety procedures when you do work on the fuel system (Ref. TASK 28-00-00-910-001).

 (2)
 Put a warning notice on the slat/flap control lever to tell persons not to operate the flight controls.

 (3)
 Put the safety barriers in position.


 4. Procedure
_________ (Ref. Fig. 602/TASK 28-11-00-991-001) Subtask 28-11-00-220-050 R A. Check Leak Monitor for Evidence of Fuel Leakage and Correct Closure of R the Valve
 (1)
 Put the WATER DRAIN PURGER (98A28104000000) in position below the tank leak monitor.

 (2)
 Push the probe of the WATER DRAIN PURGER into the tank leak monitor and drain the tank leak monitor contents.

 (3)
 Remove the WATER DRAIN PURGER from the tank leak monitor.

 (4)
 Make sure that the tank leak monitor seals correctly.

 (5)
 Examine the contents of the bottle for signs of fuel and/or water (Ref. TASK 12-32-28-281-001). No fuel tank leakage is permitted.


 NOTE : Signs of fuel show that there is a fuel tank leak.
____
 1EFF : ALL 1 28-11-00Page 607 1 1 Feb 01/04 1 1 1CES 1


 Tank Leak Monitor - Draining
 Figure 602/TASK 28-11-00-991-001
 1EFF :  ALL  1  28-11-00 Page 608 
1  1  Feb 01/98
 1  1
 1CES  1

 

 5. Close-up
________ Subtask 28-11-00-942-052
 A. Removal of Equipment
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Remove the safety barriers.

 (3)
 Remove the warning notice(s).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 1EFF : ALL 1 28-11-00Page 609 1 1 Feb 01/98 1 1 1CES 1 TASK 28-11-00-280-002


 Fuel Tank Leak Checks
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油1(127)