28-CONTENTS Page 3 Aug 01/05 R CES
CHAPTER 28
__________
FUEL
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ with Biobor Biocide Biocidal Shock Treatment for Heavy 338 ALL Contamination - With Fuel Mixed with Kathon Biocide Biocidal Shock Treatment for Heavy 344 ALL Contamination - Using Biobor Biocide With a Metered Injection Rig Biocidal Shock Treatment for Heavy 350 ALL Contamination - Using Kathon Biocide With a Metered Injection Rig Biocidal Preventative Treatment 356 ALL for Aircraft in Long-Term Storage
-
With Fuel Mixed with Biobor
Biocide
Biocidal Preventative Treatment 358 ALL
for Aircraft in Long-Term Storage
-
With Fuel Mixed with Kathon
Biocide
Biocidal Preventative Treatment 360 ALL
for Aircraft in Long-Term Storage
-
Using Biobor Biocide With a
Metered Injection Rig
Biocidal Preventative Treatment 363 ALL
for Aircraft in Long-Term Storage
-
Using Kathon Biocide With a
Metered Injection Rig
TANKS 28-11-00
ADJUSTMENT/TEST 501 ALL Leak Test with Fuel of the 501 001-049, 051-099 Wing-Tank Outer-Cell 101-149, 151-199
201-299, 401-499 Leak Test with Fuel of the 509 001-049, 051-099 Wing-Tank Outer and Inner Cells 101-149, 151-199
201-299, 401-499 Leak Test with Fuel of the Wing 518 301-399, Tank Leak Test of the Center Tank 527 ALL Leak Test with Fuel of the Vent 534 ALL Surge Tank Leak Test of the Wing Tanks and 540 ALL Vent Surge Tank (without Fuel) by the Local Blowing Procedure
28-CONTENTS Page 4 Aug 01/05 R CES
CHAPTER 28
__________
FUEL
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ Leak Test of the Wing Tanks and 546 ALL Vent Surge Tank (without Fuel) by the Vacuum and Dye Procedure Leak Test of the Left Wing and 556 ALL Vent Surge Tanks and the Center Tank (without Fuel) by the Vacuum and Dye Procedure Leak Test of the Fuel Tanks -566 ALL Without Fuel - Helium Procedure
TANKS 28-11-00
INSPECTION/CHECK 601 ALL
Check for Full and Free Movement 601 ALL
of Clack Valves
Check Leak Monitor for Evidence of 606 ALL
Fuel Leakage and Correct Closure
of the Valve
Fuel Tank Leak Checks 610 ALL
TANKS 28-11-00
CLEANING/PAINTING 701 ALL
Cleaning of the Fuel Tanks 701 ALL
VALVE - WATER DRAIN 28-11-41
REMOVAL/INSTALLATION 401 ALL Removal of the Water Drain Valve 401 ALL 21QM (22QM) Installation of the Water Drain 406 ALL Valve 21QM (22QM) Removal of the Water Drain Valve 412 001-049, 051-099 23QM (24QM) 101-149, 151-199
201-299, 401-499 Installation of the Water Drain 417 001-049, 051-099 Valve 23QM (24QM) 101-149, 151-199
201-299, 401-499 Removal of the Water Drain Valve 424 ALL 25QM (26QM) Installation of the Water Drain 434 ALL Valve 25QM (26QM) Removal of the Outer Valve 21QM 442 ALL (22QM), 23QM (24QM), 25QM (26QM) Installation of the Outer Valve 447 ALL 21QM (22QM), 23QM (24QM), 25QM (26QM) Removal of the Water Drain Valve 452 ALL
28-CONTENTS Page 5 Aug 01/05 R CES
CHAPTER 28
__________
FUEL
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ 94QM, 95QM Installation of the Water Drain 456 ALL Valve 94QM, 95QM Removal of the Outer Valve 94QM, 461 ALL 95QM Installation of the Outer Valve 463 ALL 94QM, 95QM
CLACK VALVE 28-11-42
REMOVAL/INSTALLATION 401 ALL
Removal of the Clack Valve (RIB 2) 401 ALL
Installation of the Clack Valve 408 ALL
(RIB 2)
Removal of the Clack Valve 416 301-399,
214QM(216QM), 215QM(217QM)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油1(34)