• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:45来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 

CH/SE/SU  C  PAGE  DATE  CH/SE/SU  C  PAGE  DATE  CH/SE/SU  C  PAGE  DATE 
28-46-34  406 May01/05 
28-46-43  401 Feb01/98 
28-46-43  402 May01/04 
28-46-43  R  403 Aug01/05 
28-46-43  404 May01/04 
28-46-43  405 May01/04 
28-46-43  406 May01/05 
28-46-43  407 May01/04 
28-46-43  R  408 Aug01/05 
28-46-43  409 May01/04 
28-46-43  410 May01/04 
28-46-43  411 May01/98

 28-L.E.P. Page 23 Aug 01/05
 CES  CHAPTER 28


__________
 FUEL
 TABLE OF CONTENTS
_________________
 SUBJECT_______  CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ FUEL - GENERAL 28-00-00
______________ DESCRIPTION AND OPERATION 1 ALL General 1 ALL
 Description 1  001-049, 051-099 101-149, 151-199 201-299, 401-499
 Description 1 301-399, Component Location 2 ALL System Description 3 ALL
 Storage (Ref. 28-10-00) 3  ALL
 Distribution (Ref. 28-20-00) 19  001-049, 051-099 101-149, 151-199 201-299, 401-499
 Distribution (Ref. 28-20-00) 19  301-399,
 Indicating (Ref. 28-40-00) 22 ALL
 Power Supply 24 ALL
 Interfaces 25 ALL
 Operation/Control and Indicating 25 ALL

 Operation Limits 25 ALL The fuel types that follow can 25 ALL be used in the fuel system: Control and Indicating 40 001-049, 051-099
 101-149, 151-199 201-299, 401-499 Control and Indicating 41 301-399,
 BITE Test 42 ALL
 Hi-Level BITE (Ref. 28-46-00) 42 ALL
 Fuel Quantity Indicating System 42 ALL
 (Ref. 28-42-00)

 FUEL - GENERAL  28-00-00
_______________
 SERVICING 301 ALL
 Fuel Safety Procedures 301 ALL
 Approved Fuels 304 ALL

 FUEL - GENERAL  28-00-00
_______________
 REMOVAL/INSTALLATION 401 ALL
 Removal of the Fuel Pipes 401 ALL
 Installation of the Fuel Pipes 407 ALL

 FUEL - GENERAL  28-00-00
_______________ INSPECTION/CHECK 601 ALL Inspection of the Fuel Tank 601 001-049, 051-099
 28-CONTENTS Page 1 Aug 01/05 R CES


 CHAPTER 28
__________
 FUEL
 TABLE OF CONTENTS
_________________
 SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ Bonding 101-149, 151-199
 201-299, 401-499 Inspection of the Fuel Tank A609 301-399, Bonding Dimensional Inspection of the B612 ALL Dowel (Anti-Rotation) on Twin Motor Actuators
 FUEL - GENERAL 28-00-00
_______________
 REPAIRS 801 ALL
 Repair of the Bonding Strip 801 ALL
 Attachment

 STORAGE 28-10-00
_______
 DESCRIPTION AND OPERATION 1 ALL
 General 1 ALL
 Component Location 1 ALL
 System Description 9 ALL

 Tanks (Ref. 28-11-00) 9 ALL Tank Venting System (Ref. 9 ALL 28-12-00) Center Tank External Venting 9 ALL System (Ref. 28-13-00) Intercell Transfer System (Ref. 9 001-049, 051-099 28-15-00) 101-149, 151-199
 201-299, 401-499 Fuel Recirculation For Cooling 10 ALL (Recirculation System) (Ref. 28-16-00)
 Power Supplies 10 ALL
 Interfaces 10 ALL

 STORAGE 28-10-00
________
 SERVICING 301 ALL
 Safety Procedures When You Do Work 301 ALL
 in a Fuel Tank
 Access to the Fuel Tanks and the 306 ALL
 Work Areas

 TANKS 28-11-00 DESCRIPTION AND OPERATION 1 ALL General 1 ALL Description 1 001-049, 051-099 101-149, 151-199
 28-CONTENTS Page 2 Aug 01/05 R CES


 CHAPTER 28
__________
 FUEL
 TABLE OF CONTENTS
_________________
 SUBJECT_______  CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ 201-299, 401-499
 Description 1 301-399, Component Location 3 ALL System Description 4 ALL
 LH and RH Wing Tanks 9  001-049, 051-099 101-149, 151-199 201-299, 401-499
 LH and RH Wing Tanks 9 301-399, Center Tank 9 ALL Water Drain Valves 10 ALL Clack Valves 10 001-049, 051-099
 101-149, 151-199 201-299, 401-499
 Clack Valves 10 301-399, Power Supply 13 ALL Interfaces 13 ALL Component Description 13 ALL
 Water Drain Valve 21QM(22QM), 13 001-049, 051-099 23QM(24QM), 25QM(26QM), 94QM, 101-149, 151-199 95QM 201-299, 401-499 Water Drain Valve 21QM(22QM), 13 301-399, 25QM(26QM), 94QM, 95QM
 Operation/Control and Indication 14 ALL
 BITE Test 14 ALL

 TANKS  28-11-00
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油1(33)