• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:45来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  (c) Apply MISCELLANEOUS (Material No. 19-004) to the area with a soft 
R  brush. 
R  (d) Monitor the area for a change in color of the talcum powder. This 
R  will show the location of a fuel leak and the rate of the 
R  leakage. 
R  5. Close-up________ 
R  Subtask 28-11-00-080-054 
R  A. Remove Test Equipment 
R  (1) Loosen the nut (1) and remove the GAG - CLACK VALVE (98D28004080001) 
R  from the clack valves. 

R 1EFF : 301-399, 1 28-11-00Page 524 1 1 May 01/04 1 1 1CES 1


R  Subtask 28-11-00-410-071 
R  B. Close Access 
R  (1) Make sure that the work area is clean and clear of tool(s) and other 
R  items. 
R  (2) Install the applicable NACA vent intake 550AB, 650AB (Ref. TASK 28-
R  12-47-400-001). 
R  (3) Install the applicable dry-bay access cover 521AZ, 521BZ, 621AZ, 
R  621BZ (Ref. TASK 57-27-11-400-005). 
R  (4) Install the applicable access panels 147AZ, 148AZ (Ref. TASK 57-17-
R  11-400-001). 
R  (5) Install the applicable leading-edge access-panels 521AB, 521CB, 
R  521EB, 522AB, 522CB, 522FB, 522HB, 522JB, 522KB, 522LB, 522NB, 522QB, 
R  621AB, 621CB, 621EB, 622AB, 622CB, 622FB, 622HB, 622JB, 622KB, 622LB, 
R  622NB, 622QB. 
R  (6) Install the applicable trailing edge access panels 574AB, 574BB, 
R  575AB, 575BB, 575CB, 575DB, 575EB, 575FB, 575GB, 575HB, 674AB, 674BB, 
R  675AB, 675BB, 675CB, 675DB, 675EB, 675FB, 675GB, 675HB. 
R  Subtask 28-11-00-860-070 
R  C. Aircraft Configuration 
R  (1) Retract the flaps fully (Ref. TASK 27-50-00-866-009). 
R  (2) Retract the spoilers fully (Ref. TASK 27-60-00-866-002). 
R  (3) On the spoiler servo-control, make sure that the pointer on the hex. 
R  head is opposite the letter 'O' on the housing. 
R  (4) Remove the access platform(s). 
R  (5) Close the MLG doors (Ref. TASK 32-12-00-410-001). 
R  (6) Refuel, defuel or transfer fuel, as necessary (Ref. TASK 28-25-00-
R  869-001) (Ref. TASK 12-11-28-650-003) (Ref. TASK 28-25-00-650-001). 

R 1EFF : 301-399, 1 28-11-00Page 525 1 1 May 01/04 1 1 1CES 1


R  Subtask 28-11-00-865-104 
R  D. Remove the safety clip(s) and the tag(s) and close this(these) circuit 
R  breaker(s): 
R  1QA, 2QA, 7QA, 8QA, 11QA, 12QA, 1QL, 2QL, 3QL. 
R  Subtask 28-11-00-942-087 
R  E. Removal of Equipment 
R  (1) Make sure that the work area is clean and clear of tool(s) and other 
R  items. 
R  (2) Remove the safety barriers. 
R  (3) Remove the warning notice(s). 
R  (4) Remove the access platform(s). 
R  (5) Remove the ground support and maintenance equipment, the special and 
R  standard tools and all other items. 

R 1EFF : 301-399, 1 28-11-00Page 526 1 1 May 01/04 1 1 1CES 1 **ON A/C ALL


 TASK 28-11-00-790-003
 Leak Test of the Center Tank
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific low pressure, dry and filtered air supply No specific safety barriers No specific soft brush No specific warning notices No specific container 1 l (0.2641 USgal) No specific access platform 3 m (9 ft. 10 in.) 97A28002117002 1 PURGING TOOL
 1EFF : ALL 1 28-11-00Page 527 1 1 May 01/05R 1 1 1CES 1


 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 19-003 USA AMS 3819
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油1(111)