(2)
Make sure that the access platform is below the applicable access panel 540AB(640AB).
(3)
Make sure that the applicable access panel 540AB(640AB) is removed (Ref. TASK 28-10-00-910-002) (Ref. TASK 57-27-11-000-001).
(4)
Make sure that the applicable wing tank surge door 540BZ(640BZ) is open and that the HOOK-COVER (RIB2-SURGE DOORS) (98D57004014000) is installed.
1EFF : ALL 1 28-11-41Page 436 1 1 Aug 01/05 1 1 1CES 1
4. Procedure
_________
**ON A/C 001-001, 051-052,
(Ref. Fig. 403/TASK 28-11-41-991-003)
**ON A/C 002-049, 053-061, 101-103, 201-203,
(Ref. Fig. 403A/TASK 28-11-41-991-003-A)
**ON A/C 301-399,
(Ref. Fig. 403B/TASK 28-11-41-991-003-C) R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499, Post SB 28-1077 For A/C 001-049,051-061,101-103,201-203, (Ref. Fig. 403C/TASK 28-11-41-991-003-B) **ON A/C ALL
Subtask 28-11-41-420-060
A. Preparation for Installation
(1)
Clean the component interfaces and the adjacent area with a MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026).
(2)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(3)
Do an inspection of the component interface and/or the adjacent area.
(4)
Apply FUELS (Material No. 01-001) or COMMON GREASE (Material No. 04-012) to the new O-ring (4), O-ring (7) and O-ring (9).
1EFF : ALL 1 28-11-41Page 437 1 1 Aug 01/05 1 1 1CES 1R **ON A/C 001-001, 051-052,
Subtask 28-11-41-420-054
B. Installation of the Water Drain Valve
(1)
Install the O-ring (4) on the union (3).
(2)
Install and tighten the union (3) on the water drain valve (5).
(3)
Put the bolts (8) in position then install one O-ring (7) on each bolt (8).
(4)
Install the O-ring (9) on the water drain valve (5).
(5)
Install the water drain valve (5) then install and tighten the nuts (6).
(6)
Remove the blanking cap from the end of the pipe (1).
(7)
Carefully install the pipe (1) in the union (3) then install and tighten the nut (2).
(8)
Apply SEALANTS (Material No. 09-007) to the nuts (6) and the ends of the bolts (8).
R **ON A/C 002-049, 053-061, 101-103, 201-203,
Subtask 28-11-41-420-054-A
B. Installation of the Water Drain Valve
(1)
Install the O-ring (4) on the union (3).
(2)
Install and tighten the union (3) on the water drain valve (5). NOTE : You must bond one of the bolts (8) (Ref. TASK 28-11-41-991-
____
003) (Ref. TASK 20-28-00-912-002).
(3)
Put the bolts (8) in position then install one O-ring (7) on each bolt (8).
(4)
Install the O-ring (9) on the water drain valve (5).
R 1EFF : 001-049, 051-061, 101-103, 201-203, 1 28-11-41Page 438 1 1 May 01/05 1 1 1CES 1
(5)
Install the water drain valve (5) then install and tighten the nuts (6).
(6)
Remove the blanking cap from the end of the pipe (1).
(7)
Carefully install the pipe (1) in the union (3) then install and tighten the nut (2).
(8) Apply SEALANTS (Material No. 09-007) to the nuts (6) and the ends of the bolts (8). **ON A/C ALL
R Post SB 28-1077 For A/C 001-049,051-061,101-103,201-203, Subtask 28-11-41-420-054-B
B. Installation of the Water Drain Valve
(1)
Install the O-ring (4) on the union (3).
(2)
Install and tighten the union (3) on the water drain valve (5). NOTE : You must bond one of the bolts (8) (Ref. TASK 28-11-41-991-
____
003) (Ref. TASK 20-28-00-912-002).
(3)
Put the bolts (8) in position then install one O-ring (7) on each bolt (8).
(4)
Install the O-ring (9) on the water drain valve (5).
(5)
Install the water drain valve (5) and the bonding lead (10) then install and tighten the nuts (6).
(6)
Remove the blanking cap from the end of the pipe (1).
(7)
Carefully install the pipe (1) in the union (3) then install and tighten the nut (2).
(8)
Apply SEALANTS (Material No. 09-007) to the nuts (6) and the ends of the bolts (8).
1EFF : ALL 1 28-11-41Page 439 1 1 May 01/05 1 1 1CES 1 **ON A/C ALL
Subtask 28-11-41-410-053
C. Close Access