B. Removal of Equipment
(1)
Remove the safety barriers.
(2)
Remove the warning notice(s).
(3)
Remove the access platform(s).
(4)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-12-00Page 417 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 TANK VENTING SYSTEM - INSPECTION/CHECK
______________________________________
TASK 28-12-00-200-001
Inspection of the Tank Venting System
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. Reason for the Job
__________________
To make sure that the tank venting system is serviceable and is not blocked.
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific safety barriers
98D57004014000 1 HOOK-COVER (RIB2-SURGE DOORS)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-11-28-650-003 Pressure Refuel with Automatic Control R 20-28-00-912-002 Electrical Bonding of Components With Conductive R Bolts and Screws in the Tanks
28-10-00-910-001 Safety Procedures When You Do Work in a Fuel Tank 28-12-41-200-001 Inspection of the Overpressure Protector 102QM
(103QM) 28-12-41-200-002 Inspection of the Overpressure Protector 96QM 28-12-41-200-003 Inspection of the Overpressure Protector 46QM (47QM) 28-12-46-200-001 Inspection of the Wing-Tank Overpressure Protector
Outlet
1EFF : ALL 1 28-12-00Page 601 1 1 May 01/98 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
28-12-47-000-001 Removal of the NACA Vent Intake
28-12-47-200-001 28-12-47-400-001 Visual Check of NACA Intake for Signs of BlockageInstallation of the NACA Vent Intake
28-25-00-650-001 Pressure Defuel
28-25-00-650-003 To Drain Remaining Fuel from the Wing Tanks and the Center Tank
28-25-00-869-001 Fuel Transfer
57-17-11-000-001 57-17-11-400-001 57-27-11-000-001 Removal of the Covers 147AZ (148AZ)Installation of the Covers 147AZ (148AZ)Removal of the Access Panel (540AB, 540BB, 540CB, 540DB, 540EB, 540FB, 540GB, 640AB, 640BB, 640CB,
57-27-11-000-002 640DB, 640EB, 640FB, 640GB)Removal of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,
550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,
57-27-11-400-001 ....)Installation of the Access Panel (540AB, 540BB, 540CB, 540DB, 540EB, 540FB, 540GB, 640AB, 640BB,
57-27-11-400-002 640CB, 640DB, 640EB, 640FB, 640GB)Installation of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB,
550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB,
....)
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
28-12-00-991-001 **ON A/C 301-399, Fig. 601
R 28-12-00-991-001-A Fig. 601A **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
28-12-00-991-002 **ON A/C 301-399, Fig. 602
28-12-00-991-002-A Fig. 602A
1EFF : ALL 1 28-12-00Page 602 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL
3. Job Set-up
__________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
(Ref. Fig. 601/TASK 28-12-00-991-001)
**ON A/C 301-399,
(Ref. Fig. 601A/TASK 28-12-00-991-001-A)
**ON A/C ALL
Subtask 28-12-00-941-050
A. Safety Precautions WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
_______
(1) You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.
(2) Put the safety barriers in position.
Subtask 28-12-00-650-050
B. Fuel Configuration 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FUEL 燃油1(164)