• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:45来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 B. Removal of Equipment
 (1)
 Remove the safety barriers.

 (2)
 Remove the warning notice(s).

 (3)
 Remove the access platform(s).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-12-00Page 417 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 TANK VENTING SYSTEM - INSPECTION/CHECK


______________________________________
 TASK 28-12-00-200-001
 Inspection of the Tank Venting System
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1. Reason for the Job
__________________
 To make sure that the tank venting system is serviceable and is not blocked.
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific safety barriers
 98D57004014000 1 HOOK-COVER (RIB2-SURGE DOORS)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-11-28-650-003 Pressure Refuel with Automatic Control R 20-28-00-912-002 Electrical Bonding of Components With Conductive R Bolts and Screws in the Tanks
 28-10-00-910-001 Safety Procedures When You Do Work in a Fuel Tank 28-12-41-200-001 Inspection of the Overpressure Protector 102QM
 (103QM) 28-12-41-200-002 Inspection of the Overpressure Protector 96QM 28-12-41-200-003 Inspection of the Overpressure Protector 46QM (47QM) 28-12-46-200-001 Inspection of the Wing-Tank Overpressure Protector
 Outlet
 1EFF : ALL 1 28-12-00Page 601 1 1 May 01/98 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------


28-12-47-000-001  Removal of the NACA Vent Intake
 28-12-47-200-001 28-12-47-400-001  Visual Check of NACA Intake for Signs of BlockageInstallation of the NACA Vent Intake
 28-25-00-650-001  Pressure Defuel
 28-25-00-650-003  To Drain Remaining Fuel from the Wing Tanks and the Center Tank
 28-25-00-869-001  Fuel Transfer
 57-17-11-000-001 57-17-11-400-001 57-27-11-000-001  Removal of the Covers 147AZ (148AZ)Installation of the Covers 147AZ (148AZ)Removal of the Access Panel (540AB, 540BB, 540CB, 540DB, 540EB, 540FB, 540GB, 640AB, 640BB, 640CB,
 57-27-11-000-002  640DB, 640EB, 640FB, 640GB)Removal of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,
 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,
 57-27-11-400-001  ....)Installation of the Access Panel (540AB, 540BB, 540CB, 540DB, 540EB, 540FB, 540GB, 640AB, 640BB,
 57-27-11-400-002  640CB, 640DB, 640EB, 640FB, 640GB)Installation of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB,
 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB,
 ....) 

R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 28-12-00-991-001 **ON A/C 301-399, Fig. 601
R  28-12-00-991-001-A Fig. 601A **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 28-12-00-991-002 **ON A/C 301-399, Fig. 602
 28-12-00-991-002-A  Fig. 602A

 1EFF : ALL 1 28-12-00Page 602 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL


 3. Job Set-up
__________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 (Ref. Fig. 601/TASK 28-12-00-991-001)
 **ON A/C 301-399,

 (Ref. Fig. 601A/TASK 28-12-00-991-001-A)
 **ON A/C ALL

 Subtask 28-12-00-941-050
 A. Safety Precautions WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
_______
 (1) You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.
 (2) Put the safety barriers in position.
 Subtask 28-12-00-650-050

 B. Fuel Configuration
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油1(164)