• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:45来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Installation of the Clack Valve 420 301-399,
 214QM(216QM), 215QM(217QM)

 CAP/ADAPTOR - GRAVITY FILL 28-11-43
 REMOVAL/INSTALLATION 401 ALL
 Removal of the Gravity Fill 401 ALL
 Cap/Adaptor
 Installation of the Gravity Fill 406 ALL
 Cap/Adaptor

 TANK VENTING SYSTEM 28-12-00
 DESCRIPTION AND OPERATION 1 ALL
 General 1 ALL
 Component Location 1 ALL
 System Description 7 ALL
 Power Supplies 10 ALL
 Interfaces 10 ALL
 Component Description 10 ALL

 Overpressure Protector 10 ALL 46QM(47QM) Overpressure Protector (On the 12 001-049, 051-099 Access Panel 540HB(640HB)) 101-149, 151-199
 201-299, 401-499 Overpressure Protector (On the 12 301-399, Access Panel 540PB(640PB)) Overpressure Protector 96QM 15 ALL (Center Tank) Overpressure Protector 15 001-049, 051-099 102QM(103QM) 101-149, 151-199
 201-299, 401-499 Vent Protector 48QM(49QM) 18 ALL Vent Float Valve 15QM(18QM), 18 001-049, 051-099 16QM(17QM) 101-149, 151-199
 28-CONTENTS Page 6 Aug 01/05 R CES


 CHAPTER 28
__________
 FUEL
 TABLE OF CONTENTS
_________________
 SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________
 201-299, 401-499 Vent Float Valve 212QM(213QM) 21 301-399, Clack Valve 214QM(215QM), 21 301-399, 216QM(217QM)
 Operation/Control and Indication 21 ALL
 BITE Test 21 ALL

 TANK VENTING SYSTEM 28-12-00
 DEACTIVATION/REACTIVATION 401 ALL
 De-activation of the Overpressure 401 ALL
 Protector 46QM(47QM)

 Refer to the MMEL TASK: 401 ALL
 28-12-01-B)
 Re-activation of the Overpressure 405 ALL
 Protector 46QM(47QM)

 Refer to the MMEL TASK: 405 ALL
 28-12-01-B) De-activation of the Overpressure 407 001-049, 051-099 Protector 102QM(103QM) 101-149, 151-199
 201-299, 401-499 Refer to the MMEL TASK: 407 001-049, 051-099 28-12-01-A) 101-149, 151-199
 201-299, 401-499 Re-activaton of the Overpressure 414 001-049, 051-099 Protector 102QM(103QM) 101-149, 151-199
 201-299, 401-499 Refer to the MMEL TASK: 414 001-049, 051-099 28-12-01-A) 101-149, 151-199
 201-299, 401-499
 TANK VENTING SYSTEM 28-12-00
 INSPECTION/CHECK 601 ALL
 Inspection of the Tank Venting 601 ALL
 System
 Visual Check of Vent Surge Tank 614 ALL
 Burst Disc (EXTERNAL)

 PROTECTOR - OVERPRESSURE 28-12-41
 REMOVAL/INSTALLATION 401 ALL Removal of the Overpressure 401 ALL Protector 46QM (47QM) Installation of the Overpressure 405 ALL Protector 46QM (47QM) Removal of the Overpressure 409 001-049, 051-099 Protector 102QM (103QM) 101-149, 151-199
 28-CONTENTS Page 7 Aug 01/05 R CES


 CHAPTER 28
__________
 FUEL
 TABLE OF CONTENTS
_________________
 SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________
 201-299, 401-499 Installation of the Overpressure 414 001-049, 051-099 Protector 102QM (103QM) 101-149, 151-199
 201-299, 401-499 Removal of the Overpressure 420 ALL Protector 96QM Installation of the Overpressure 424 ALL Protector 96QM
 PROTECTOR - OVERPRESSURE 28-12-41
 INSPECTION/CHECK 601 ALL Inspection of the Overpressure 601 ALL Protector 46QM (47QM) Inspection of the Overpressure 607 001-049, 051-099 Protector 102QM (103QM) 101-149, 151-199
 201-299, 401-499 Inspection of the Overpressure 611 ALL Protector 96QM
 VALVE - FLOAT VENT 28-12-43
 REMOVAL/INSTALLATION 401 ALL Removal of the Vent Float-Valve 401 001-049, 051-099 15QM (18QM) 101-149, 151-199
 201-299, 401-499 Installation of the Vent 405 001-049, 051-099 Float-Valve 15QM (18QM) 101-149, 151-199
 201-299, 401-499 Removal of the Vent Float-Valve 410 001-049, 051-099 16QM (17QM) 101-149, 151-199
 201-299, 401-499 Installation of the Vent 414 001-049, 051-099 Float-Valve 16QM (17QM) 101-149, 151-199
 201-299, 401-499 Removal of the Float Vent Valve 419 301-399, 212QM(213QM) Installation of the Float Vent 423 301-399, Valve 212QM(213QM)
 CHECK VALVE - FUEL DRAIN 28-12-44
 REMOVAL/INSTALLATION 401 ALL Removal of the Check Valve 52QM 401 001-049, 051-099 (53QM) 101-149, 151-199
 201-299, 401-499 Installation of the Check Valve 406 001-049, 051-099 52QM (53QM) 101-149, 151-199
 201-299, 401-499 Removal of the Check Valve 50QM 409 ALL (51QM) Installation of the Check Valve 412 ALL
 28-CONTENTS Page 8 Aug 01/05 R CES


 CHAPTER 28
__________
 FUEL
 TABLE OF CONTENTS
_________________
 SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________ 50QM (51QM) Removal of the Check Valve 120QM 416 ALL (121QM) Installation of the Check Valve 420 ALL 120QM (121QM) Removal of the Check Valve 93QM 424 ALL Installation of the Check Valve 428 ALL (93QM)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油1(35)