• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:45来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 PANEL ASSEMBLY - OVER PRESSURE 28-12-45
 PROTECTOR, VENT SURGE TANK
 REMOVAL/INSTALLATION 401 ALL Removal of the Panel Assembly 401 ALL 550CB(650CB) Installation of the Panel Assembly 404 ALL 550CB(650CB)
 OUTLET - OVERPRESSURE PROTECTOR, INNER 28-12-46
 CELL
 REMOVAL/INSTALLATION 401 ALL Removal of the 401 ALL Overpressure-Protector Outlet Installation of the 406 ALL Overpressure-Protector Outlet
 OUTLET - OVERPRESSURE PROTECTOR 28-12-46
 INSPECTION/CHECK 601 ALL Inspection of the Wing-Tank 601 ALL Overpressure Protector Outlet
 INTAKE - NACA VENT 28-12-47
 REMOVAL/INSTALLATION 401 ALL Removal of the NACA Vent Intake 401 ALL Installation of the NACA Vent 407 ALL Intake
 INTAKE - NACA VENT 28-12-47
 INSPECTION/CHECK 601 ALL Visual Check of NACA Intake for 601 ALL Signs of Blockage
 WING CENTER TANK EXTERNAL VENTILATING 28-13-00
 SYSTEM DESCRIPTION AND OPERATION 1 ALL General 1 ALL Component Location 1 ALL System Description 1 ALL Power Supply 1 ALL Interface 1 ALL Component Description 3 ALL Operation/Control and Indicating 3 ALL
 28-CONTENTS Page 9 May 01/05 R CES


 CHAPTER 28
__________
 FUEL
 TABLE OF CONTENTS
_________________
 SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________ BITE Test 3 ALL
 WING CENTER TANK EXTERNAL VENTILATING 28-13-00
 SYSTEM
 ADJUSTMENT/TEST 501 ALL
 Functional Check (Pressure and 501 ALL
 Free Flow) of Vapor Seal and
 Vent/Drain System

 WING CENTER TANK EXTERNAL VENTILATING 28-13-00
 SYSTEM
 INSPECTION/CHECK 601 ALL
 Check Drain Mast Outlet for 601 ALL
 Obstruction

 VAPOR SEAL 28-13-42
 REMOVAL/INSTALLATION 401 ALL
 Removal of the Vapor Seal 401 ALL
 Installation of the Vapor Seal 420 ALL

 VAPOR SEAL 28-13-42
 INSPECTION/CHECK 601 ALL
 Visual Inspection of the Vapor 601 ALL
 Seal

 VAPOR SEAL 28-13-42
 REPAIRS 801 ALL
 Center Tank Vapor Seal Membrane 801 ALL
 Repair

 DRAIN MAST 28-13-43
 REMOVAL/INSTALLATION 401 ALL
 Removal of the Drain Mast 401 ALL
 Installation of the Drain Mast 404 ALL

 MONITOR - LEAK 28-13-44
 REMOVAL/INSTALLATION 401 ALL
 Removal of the Leak Monitor 401 ALL
 (500QM)
 Installation of the Leak Monitor 404 ALL
 (500QM)

 INTERCELL TRANSFER 28-15-00 DESCRIPTION AND OPERATION 1 001-049, 051-099 101-149, 151-199 201-299, 401-499 General 1 001-049, 051-099 101-149, 151-199 201-299, 401-499
 28-CONTENTS Page 10 Aug 01/05 R CES


 CHAPTER 28
__________
 FUEL
 TABLE OF CONTENTS
_________________
 SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________ Component Location 1 001-049, 051-099 101-149, 151-199 201-299, 401-499 System Description 3 001-049, 051-099 101-149, 151-199 201-299, 401-499 Power supplies 5 001-049, 051-099 101-149, 151-199 201-299, 401-499 Interfaces 5 001-049, 051-099 101-149, 151-199 201-299, 401-499 Component Description 5 001-049, 051-099 101-149, 151-199 201-299, 401-499 Intercell transfer valve 5 001-049, 051-099 27QM(29QM), 28QM(30QM) 101-149, 151-199 201-299, 401-499 Intercell-transfer-valve drive 5 001-049, 051-099 shaft 70QM(72QM), 71QM(73QM) 101-149, 151-199 201-299, 401-499 Intercell-transfer-valve 10 001-049, 051-099 actuator 9QP(10QP), 11QP(12QP) 101-149, 151-199 201-299, 401-499 Operation/Control and Indicating 10 001-049, 051-099 101-149, 151-199 201-299, 401-499 Operation/control 10 001-049, 051-099 101-149, 151-199 201-299, 401-499 Indication 13 001-049, 051-099 101-149, 151-199 201-299, 401-499 Test 13 001-049, 051-099 101-149, 151-199 201-299, 401-499
 INTERCELL TRANSFER  28-15-00
 ADJUSTMENT/TEST 501  001-049, 051-099 101-149, 151-199 201-299, 401-499
 Operational Check of Individual 501 001-049, 051-099 Transfer Valves to Ensure Valve 101-149, 151-199 Shaft Rotates Valve to Open 201-299, 401-499 Position
 28-CONTENTS Page 11 Aug 01/05 R CES


 CHAPTER 28
__________
 FUEL
 TABLE OF CONTENTS
_________________
 SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________ Functional (BITE) Test of the 509 001-049, 051-099 Intercell Transfer Valves 101-149, 151-199 201-299, 401-499 VALVE - TRANSFER 28-15-41 REMOVAL/INSTALLATION 401 001-049, 051-099 101-149, 151-199 201-299, 401-499 Removal of the Transfer Valve 27QM 401 001-049, 051-099 (29QM), 28QM (30QM) 101-149, 151-199 201-299, 401-499 Installation of the Transfer Valve 407 001-049, 051-099 27QM (29QM), 28QM (30QM) 101-149, 151-199 201-299, 401-499 SHAFT - DRIVE, TRANSFER VALVE 28-15-42 REMOVAL/INSTALLATION 401 001-049, 051-099 101-149, 151-199 201-299, 401-499 Removal of the Transfer Valve 401 001-049, 051-099 Drive 70QM(72QM) 101-149, 151-199 201-299, 401-499 Installation of the Transfer Valve 405 001-049, 051-099 Drive 70QM(72QM) 101-149, 151-199 201-299, 401-499 Removal of the Transfer Valve 411 001-049, 051-099 Drive 71QM(73QM) 101-149, 151-199 201-299, 401-499 Installation of the Transfer Valve 415 001-049, 051-099 Drive 71QM(73QM) 101-149, 151-199 201-299, 401-499 ACTUATOR - TRANSFER VALVE 28-15-51 REMOVAL/INSTALLATION 401 001-049, 051-099 101-149, 151-199 201-299, 401-499 Removal of the Actuator 9QP(10QP) 401 001-049, 051-099 101-149, 151-199 201-299, 401-499 Installation of the Actuator 405 001-049, 051-099 9QP(10QP) 101-149, 151-199 201-299, 401-499 Removal of the Actuator 11QP(12QP) 410 001-049, 051-099 101-149, 151-199 201-299, 401-499 Installation of the Actuator 413 001-049, 051-099 11QP(12QP) 101-149, 151-199 201-299, 401-499
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油1(36)