 For the bonding locations in the center tank: (Ref. Fig. 657/TASK 28-00-00-991-130, 658/TASK 28-00-00-991-131)


 5. Close-up
________
 Subtask 28-00-00-410-061-A
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close access to the applicable fuel tank (Ref. TASK 28-10-00-910-002).

 (3)
 Install the applicable access panels:

 (a)
 For the LH and RH wing (Ref. TASK 57-27-11-400-001) and (Ref. TASK 57-27-11-400-002).

 (b)
 For the center tank (Ref. TASK 57-17-11-400-001).

 


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 610 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 28-00-00-650-053


 B. Fuel Configuration
 (1) Refuel the aircraft (Ref. TASK 12-11-28-650-003). Subtask 28-00-00-942-055
 C. Removal of Equipment
 (1)
 Remove the safety barriers.

 (2)
 Remove the access platform(s).

 (3)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 611 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 1 to RIB 2, Left Hand
 Figure 605/TASK 28-00-00-991-017- 12 (SHEET 1)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 612 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 1 to RIB 2, Left Hand
 Figure 605/TASK 28-00-00-991-017- 22 (SHEET 2)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 613 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 2 to RIB 3, Left Hand
 Figure 606/TASK 28-00-00-991-018- 12 (SHEET 1)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 614 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 2 to RIB 3, Left Hand
 Figure 606/TASK 28-00-00-991-018- 22 (SHEET 2)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 615 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 3 to RIB 4, Left Hand
 Figure 607/TASK 28-00-00-991-019- 12 (SHEET 1)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 616 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 3 to RIB 4, Left Hand
 Figure 607/TASK 28-00-00-991-019- 22 (SHEET 2)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 617 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 4 to RIB 5, Left Hand
 Figure 608/TASK 28-00-00-991-020- 12 (SHEET 1)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 618 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 4 to RIB 5, Left Hand
 Figure 608/TASK 28-00-00-991-020- 22 (SHEET 2)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 619 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 5 to RIB 6, Left Hand
 Figure 609/TASK 28-00-00-991-021- 12 (SHEET 1)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 620 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 5 to RIB 6, Left Hand
 Figure 609/TASK 28-00-00-991-021- 22 (SHEET 2)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 621 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 6 to RIB 7, Left Hand
 Figure 610/TASK 28-00-00-991-022- 12 (SHEET 1)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 622 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 6 to RIB 7, Left Hand
 Figure 610/TASK 28-00-00-991-022- 22 (SHEET 2)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 623 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 7 to RIB 8, Left Hand
 Figure 611/TASK 28-00-00-991-023- 12 (SHEET 1)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 624 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 7 to RIB 8, Left Hand
 Figure 611/TASK 28-00-00-991-023- 22 (SHEET 2)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 625 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 8 to RIB 9, Left Hand
 Figure 612/TASK 28-00-00-991-024- 12 (SHEET 1)

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-00-00Page 626 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Bonding Detail, RIB 8 to RIB 9, Left Hand
 Figure 612/TASK 28-00-00-991-024- 22 (SHEET 2)
 