-------------------------------------------------------------------------------
LOCATION OF LIGHT HEAVY CONTINUOUS
LEAK LEAKAGE LEAKAGE LEAKAGE
-------------------------------------------------------------------------------
1. Open areas, where leakage A B C
cannot flow to a possible
fire source:
- top and bottom wing
surfaces.
2. Not fully closed areas: A B C
- rear walls of tank.
3. Closed areas: B C C
- front walls of tank
- dry bay
- engine pylon location
- bottom center wing-surfaces.
KEY
-------------------------------------------------------------------------------
TYPE OF REPAIR
-------------------------------------------------------------------------------
A No repair is necessary. Do a weekly
inspection to make sure that there is no
change of the leak rate.
(You can do a repair if an applicable
maintenance period is available).
B No immediate repair is necessary. Do a daily
inspection to make sure that there is no
change of the leak rate.
Do a permanent repair at the next scheduled
'A' or 'C' check that occurs first.
C Do a temporary repair immediately (before the
next flight) (Ref. Task 51-76-12-300-003).
Do a permanent repair during the 500 flight
hours that follow, or at the next scheduled 'C'
R check if this occurs first
R (Ref. Task 51-76-12-300-001)
R or (Ref. Task 51-76-12-300-002).
R
NOTE : For more detailed fuel tank repair data, refer to the SIL____
(Ref. SIL 57-086).
1EFF : ALL 1 28-11-00Page 613 1 1 Nov 01/02 1 1 1CES 1 TANKS - CLEANING/PAINTING
_________________________
TASK 28-11-00-100-001
Cleaning of the Fuel Tanks
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific safety barriers
No specific adjustable access platform 4.0 m (13 ft. 1 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-11-28-650-003 Pressure Refuel with Automatic Control 28-10-00-910-001 Safety Procedures When You Do Work in a Fuel Tank 28-10-00-910-002 Access to the Fuel Tanks and the Work Areas 28-12-45-000-001 Removal of the Panel Assembly 550CB(650CB) 28-12-45-400-002 Installation of the Panel Assembly 550CB(650CB) 28-12-46-000-001 Removal of the Overpressure-Protector Outlet 28-12-46-400-001 Installation of the Overpressure-Protector Outlet 28-12-47-000-001 Removal of the NACA Vent Intake 28-12-47-400-001 Installation of the NACA Vent Intake 28-25-00-650-001 Pressure Defuel
1EFF : ALL 1 28-11-00Page 701 1 1 Feb 01/98 1 1 1CES 1
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
28-25-00-650-003 To Drain Remaining Fuel from the Wing Tanks and the
Center Tank
28-25-00-869-001 Fuel Transfer
57-17-11-000-001 Removal of the Covers 147AZ (148AZ)
R 57-17-11-000-001 Removal of the Access Cover 148AZ and the
R ACT-Equipment Support Door 57-17-11-400-001 Installation of the Covers 147AZ (148AZ) 57-27-11-000-001 Removal of the Access Panel (540AB, 540BB, 540CB, 540DB, 540EB, 540FB, 540GB, 640AB, 640BB, 640CB, 640DB, 640EB, 640FB, 640GB) 57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB, ....) 57-27-11-400-001 Installation of the Access Panel (540AB, 540BB, 540CB, 540DB, 540EB, 540FB, 540GB, 640AB, 640BB, 640CB, 640DB, 640EB, 640FB, 640GB) 57-27-11-400-002 Installation of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, ....)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油1(129)