• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-22 06:45来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2)
 Put the overpressure protector (4) in position. Engage the location dowel in the dowel hole (2).

 (3)
 Apply a thin layer of COMMON GREASE (Material No. 04-004) to the threads of the bolts (1) then install and tighten the bolts (1).

 (4)
 Do a bonding check between the overpressure protector and RIB 15 (Ref. TASK 20-28-00-912-002). The bonding resistance must be less than 10 milliohms.

 (5)
 Apply SEALANTS (Material No. 09-007) over the ends of the bolts (1) and the edge of the overpressure protector (4) where it touches RIB


 15.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-12-41Page 417 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,


 Post SB 28-1077 For A/C 001-001,051-052,
 Subtask 28-12-41-420-051-A
 B. Installation of the Overpressure Protector 102QM(103QM)
 (1)
 Install the new O-ring (3) on the overpressure protector (4).

 (2)
 Put the overpressure protector (4) in position. Engage the location dowel in the dowel hole (2).


 NOTE : You must bond one of the bolts (1) (Ref. TASK 28-12-41-991-
____
 004) (Ref. TASK 20-28-00-912-002).

 (3)
 Apply a thin layer of COMMON GREASE (Material No. 04-004) to the threads of the bolts (1) then install and tighten the bolts (1).

 (4)
 Do a bonding check between the overpressure protector and RIB 15 (Ref. TASK 20-28-00-912-002). The bonding resistance must be less than 10 milliohms.

 (5)
 Apply SEALANTS (Material No. 09-007) over the ends of the bolts (1) and the edge of the overpressure protector (4) where it touches RIB


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油1(172)