 (9) Make a visual inspection of the vent float valves: - one installed outboard of STA8268/RIB15 - one installed inboard of STA8268/RIB15. Make sure that: - the valve will operate correctly - the valve disc will operate correctly - the valve closes correctly - there is no corrosion - there are no cracks - there are no large dents - there is no distortion.
 (10) Make sure that all of the bonding straps are correctly installed and attached (Ref. TASK 20-28-00-912-002).
 (11) Make a visual inspection of the NACA vent intake (Ref. TASK 28-12-47-200-001). 
R  **ON A/C 301-399, 
R  Subtask 28-12-00-210-050-A 
R  A. Inspection of the Tank Venting System 
R R  (1) Make a visual inspection of the open end of the center-tank vent-pipe at the aircraft centerline. The pipe must not be blocked. 
R R R  (2) Make a visual inspection of the open end of the wing-tank vent-inlet-duct located outboard of RIB2. The pipe must not be blocked. 
R R R  (3) Make a visual inspection of the open end of the wing-tank vent-duct and the center-tank vent-pipe. They are installed outboard of RIB22. They must not be blocked. 
R R R R R R R R R R  (4) Make a visual inspection of: - the complete wing-tank vent-duct and the wing-tank vent-inlet-duct - the complete center-tank vent-pipe. There must be no: - large dents - cracks - distortion - corrosion. Make sure that the ducts and the pipe are correctly sealed along their length.

 

R  (5) Make a visual inspection of the surge-tank vent-duct outboard of 
R  RIB23. There must be no: 
R  - large dents 
R  - cracks 
R  - distortion 
R  - corrosion. 
R  (6) Make a visual inspection of the rubber check valves: 
R  - one installed in the center-tank vent-pipe inboard of RIB1 
R  - one installed in the wing-tank vent-inlet-duct outboard of RIB2 
R  - one installed at the end of the wing-tank vent-duct inboard of 
R  RIB2. 
R  Make sure that the valves: 
R  - are not blocked 
R  - will open and close correctly 
R  - are attached correctly 
R  - are not damaged 
R  - are not corroded 
R  - are closed. 
R  Make sure that the front edge of the check valve is horizontal. 

R  (7) Make a visual inspection of the overpressure protectors 46QM(47QM) 
R  (Ref. TASK 28-12-41-200-003), 96QM (Ref. TASK 28-12-41-200-002) and 
R  the overpressure protector outlets (Ref. TASK 28-12-46-200-001). 
R  (8) Make a visual inspection of the vent float valves 212QM(213QM). The 
R  float vent valves are installed inboard of RIB22. 
R  Make sure that: 
R  - the valve will operate correctly 
R  - the valve disc will operate correctly 
R  - the valve closes correctly 
R  - there is no corrosion 
R  - there are no cracks 
R  - there are no large dents 
R  - there is no distortion. 
R  (9) Make a visual inspection of the clack valves 214QM(215QM) and 
R  216QM(217QM). The clack valves are installed inboard of RIB22. 
R  Make sure that: 
R  - the valve will operate correctly 
R  - the valve flap will operate correctly 
R  - the valve closes correctly 
R  - there is no corrosion 
R  - there are no cracks 
R  - there are no large dents 
R  - there is no distortion.

 

R R  (10) Make sure that all of the bonding straps are correctly installed and attached (Ref. TASK 20-28-00-912-002). 
R R  (11) Make a visual inspection of the NACA vent intake (Ref. TASK 28-12-47-200-001). 
R  **ON A/C ALL
 5. Close-up________
 Subtask 28-12-00-410-050
 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.
 (2) Remove the HOOK-COVER (RIB2-SURGE DOORS) and carefully close the surge door: - for the left wing, surge door 540BZ - for the right wing, surge door 640BZ.
 (3) Install the NACA vent intake (Ref. TASK 28-12-47-400-001).
 (4) Install all of the access panels (Ref. TASK 57-27-11-400-001), (Ref. TASK 57-27-11-400-002).
 (5) Install the access panels 147AZ, 148AZ, (Ref. TASK 57-17-11-400-001).
 Subtask 28-12-00-650-051
 B. Fuel Configuration
 (1) Refuel, defuel or transfer fuel as necessary (Ref. TASK 12-11-28-650-003), (Ref. TASK 28-25-00-650-001) or (Ref. TASK 28-25-00-869-001).
 